Laserfiche WebLink
8. a. Dgscribe the method that will be utilized to purge and/or inert the tank(s): <br /> art-, Ice �c Ibs - _fo0C> � lc>, ,o� � <br /> c, �cr <br /> b. Tank]Mping Hauler. <br /> Name <br /> Address 340 C, City ''g c,jc4rs Zip 4 3c <br /> Phone No.L 66;- I <br /> Hauler Reglstratlon>f Of hauled as hazardous) _ <br /> c. TankMping Disposal Site: <br /> Name Go <br /> Address Zoo© -a f r s V-' Clty3a L5 Zip ?330-7— <br /> Phone No,_G(P.( —)--32--7— 35-S- <br /> EPA <br /> BPA D3if Of transported to a permitted TSD facility) /-,V /A <br /> 9. is the sampling firm an independent third party from the contractor? YES JJ N011 <br /> I92. Describe,in detall,how the soli and/or water sample(s)beneath the tank and piping will be obtained: <br /> Li ECA C 5c���ti,,�c e� rr/J�r �T C—c-4 P� oJ /h C <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> 11. Handling of excavated solh <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpile? <br /> y� <br /> I L5J C�G..i L c- <br /> c) <br /> c)Contamhtated Soll Hazardous Waste Hauler. <br /> Name , �} /�1 ,� `��, Hauler Registration i C r4 Z 3 O 3 <br /> Address C/S I 7R©., c� City SGC rG e �,. Zip 45 Z,q <br /> i <br /> I Phone No. 9 (l� ) (Q Cps Q — yL�(n L( <br /> j EH 23 046(Revised 08113199) Page 5 <br />