Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - Pae 1 of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION 490-1. <br />PLAN TYPE ® 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />BUSINESS NAME (Same as Facilitv Name or DBA) 3 <br />7 -Eleven # 19976 <br />BUSINESS SITE ADDRESS 1399 N. Main Street 103. <br />CITY Manteca Bw <br />1 <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency specified <br />by the equipment manufacturers' instructions or annually, whichever is more frequent. Such work must be performed by qualified personnel. [23 CCR §2632, 2634, 2638, 26411 <br />490-3& <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY ❑ 99. OTHER (Specify): 490-3b. <br />III. MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR §2632, 26341 4X14. <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD S)1 (Check a" <br />METHOD(S) <br />that apply) <br />® L CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br />WITH AUDIBLE AND VISUAL ALARMS. [23 CCR §2632,26341 <br />SECONDARY CONTAINMENT IS: -1 a. DRY X b. LIQUID FILLED Elc. PRESSURIZED El d- UNDER VACUUM 490-6. <br />PANEL MANUFACTURER: Veeder-Root 490-7. MODEL #: TLS -350 490-8. <br />LEAK SENSOR MANUFACTURER: Veeder-Root 490-9. MODEL #(S): 794380-302 490-10' <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). [23 CCR §26431 °gall. <br />PANEL MANUFACTURER: 490.11 MODEL #: 490-13. <br />IN -TANK PROBE MANUFACTURER: 490-14. MODEL #(S): 490-15. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY 49046. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): 490-17. <br />8. <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. ❑ c. OTHERS ci 490-1.. <br />g.p.h. g.p.h. (Specify): _°vii -iv<_..._.._ <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION [23 CCR §2646.11 490-20 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) [23 CCR §26451 TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS4� a 21 <br />❑ 5. TANK INTEGRITY TESTING PER 123 CCR §2643.11 490-23. <br />490-24. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify) 490-25.__ <br />_...--- 490-26. <br />® 99. OTHER (Specify): Overfill protection -Flapper 4X1-27. <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (h heack "u <br />® 1. CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS. 49x28. <br />[23 C SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑§2636 d. UNDER VACUUM 490-29. <br />PANEL MANUFACTURER: Veeder-Root 490.30. MODEL #: TLS -350 ago -31. <br />LEAK SENSOR MANUFACTURER: Veeder-Root 490-32. MODEL #(S): 794380-208 490-33. <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a. YES ❑ b. NO 490-34. <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-3'- <br />X 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br />PRODUCT FLOW WHEN A LEAK IS DETECTED. [23 CCR§26361 <br />MLLDMANUFACTURER(S): V8 orless/ F.E. Petro 490-37. MODEL#(s): LD2000 / STD -MLD 490-38. <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS. [23 CCR§26361 490-39, <br />ELLD MANUFACTURER(S): 49"0 MODEL #(S): 490.41. <br />PROGRAMMED IN LINE LEAK TEST: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. 4904Z <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ & YES ❑ b. NO 490.43. <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ K NO 4%44 <br />® 4. PIPE INTEGRITY TESTING. ago -as. <br />TEST FREQUENCY: ❑ a. ANNUALLY C1 b. EVERY 3 YEARS ® c. OTHER (Specifv) SB989 every 36 mo. 4�6 <br />_ <br />❑ 5. VISUAL PIPE MONITORING. 490-48. <br />FREQUENCY: ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* 49049. <br />• Allowed for monitoring of unburied emergency generator fuel ming only per HSC §2528 1.5(6)(3) <br />_ <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA. [23 CCR §2636(aX3)1 49090-50. <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br />490-52 <br />❑ 99. OTHER (Specify) 490-53. <br />UPCF UST -D (1212007) - 1/4 www.unidocs.org <br />