Laserfiche WebLink
A <br />Ah <br />UN -022B -1/3 www.unidoKs.orrg Rev. 04/02/08 <br />RESPONSE PLAN - PAGE 1 (one form per facility) <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION Rol. <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) 1 <br />BUSINESS NAME (Same as FACILITY NAME) 3. <br />7 -Eleven # 19976 <br />BUSINESS SITE ADDRESS 103. <br />BUSINESS SITE CITY 104. <br />1399 N. Main 1 <br />Manteca <br />U. SPILL CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan (HMBP). <br />D If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining':"iazardous material from the UST system. <br />• Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. <br />➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br />effective m which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds that <br />it is non -hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br />appropriately. <br />D Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br />§66262.11 finds that it is non -hazardous. If the water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A thick Floating petroleum layer may not <br />necessarily display rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. will not be disposed to storm water systems. <br />➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br />1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br />i 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br />3. Hazardous material, other than the producttwaste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br />III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />I)IPMENT NOT PERMANENTLY ON -SUE, BUT AVAILABLE FOR USE IF NEEDED: Co fere nly i o licable <br />EQUIPMENT <br />LOCATION <br />AVAILABILITY <br />RIO. <br />R20. <br />Rao. <br />RII. <br />R21. <br />R31. <br />R12. <br />R22_ <br />R32. <br />R13. <br />R23. <br />R33. <br />R14. <br />R?4. <br />R34. <br />RIS. <br />R25. <br />R35. <br />- - --- IV. RESPONSIBLE PERSONS <br />TILE FOI:I.OWING PERSON(S) INARE RESPONSB3LE FOR AU MORiZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br />N.tl.ME Roo. <br />TULx R50. <br />Ian Moorhead <br />Environmental Compliance Manager <br />NAME R41. <br />TITLE RSI. <br />Patrick McConnell <br />Sr. Geologist, STANTEC Consultants <br />NAME R4' <br />TITLE R52 <br />(Damon Brown <br />Sr. Geologist, STANTEC Consultants <br />NAME R43. <br />TITLE R53. <br />V. MONITORING INDICATORS <br />IF MONITORING INDICATES A POSSIBLE UNAUTHOREMD RELEASE, SIEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br />® 1. ADDITIONAL SYSTEM TESTING OR DATA COLLECnON ® 2- INSPECTION BY QUALIFIED PERSONS ❑ 3. RECALIBRATION OF EQUIPMENT R60. <br />R61. <br />❑ 99. OTh1ER (Specify): <br />UN -022B -1/3 www.unidoKs.orrg Rev. 04/02/08 <br />