Laserfiche WebLink
T ?FIED PROGRAM CONSOLIDATED FO <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING (Check all <br />that <br />UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />® 1. CONTINUOUS ELECTRONIC MONITORING ❑ 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />490-54a. <br />❑ 4. NO DISPENSERS ❑ 99. OTHER (Specify) <br />_.......... ................... _._..--------- <br />Ort -54b. <br />.._..... __.............. ___ .._-----........................__.........._-...................................-- - <br />LEAK MONITOR MANUFACTURER: Veeder-Root 490-55. MODEL #: TLS -350 <br />-..... <br />av11•sfi. <br />LEAK SENSOR MANUFACTURER: Veeder-Root 4%-57. MODEL #(S): 794380-208 <br />490-5s. <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a. YES ❑ b. NO <br />490.59' <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO <br />490-60 <br />FAILURE(DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO <br />490-61. <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ®a. YES ❑ b. NO <br />.............__..._.-._.._.........._-....................._...........----........_............................__.......... __ _....._.. --......._..........._...__.._....- b......... <br />49x0-6-• <br />--...- .._......_......._.............................. -.............__......_.........._...._...._............_.....__....-..-- <br />UDC CONSTRUCTION IS: ® 1. SINGLE WALL ❑ 2. DOUBLE WALL <br />- ---- <br />490-63. <br />IF DOUBLE WALL: <br />490-64n <br />UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a. LIQUID ❑ b. PRESSURE ❑ c. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a. YES ❑ b. NO <br />490-fi4b. <br />VII. PERIODIC SYSTEM TESTING <br />❑ I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />490-65. <br />LEAK DETECTION (ELD) MUST BE PERFORMED, PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 123 CCR §2644.11 <br />® 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br />490-66. <br />® 3. SPILL BUCKETS ARE TESTED ANNUALLY. <br />490-67. <br />VIII. RECORD KEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />490-68. <br />® a. ALARM LOGS ❑ b. VISUAL INSPECTION RECORDS ❑ c. TANK INTEGRITY TESTING RESULTS <br />❑ d. SIR TESTING RESULTS (and supporting documentation records) ❑ e. TANK GAUGING RESULTS (and supporting documentation records) <br />® f. ATG TESTING RESULTS (and supporting documentation records) ❑ g. CORROSION PROTECTION 60 -DAY LOGS <br />® It. EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br />IX. TRAINING <br />Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: <br />490-69a. <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />490.69b. <br />490-69c. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />490-69d, <br />49n -69e. <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />490-69f. <br />STATISTICAL INVENTORY RECONCILIATION" <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br />41)(1-69g. <br />❑ OTHER (Specify): <br />490-69h. <br />491)-69i. <br />This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />490 -70 - <br />OCC). The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 <br />days of hire. This training will include, but is not limited to, the following: <br />i' Operation of the UST systems in a manner consistent with the facility's best management <br />practices. <br />The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br />The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br />Name(s) of contact person(s) for emergencies and monitoring alarms. <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. <br />491-71. <br />Overfill protection - Flapper <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1.) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br />-by this�lan occtusi2.) all conditions that indicate apoossible release are investigated_ and 3.) all monitoring records are maintained properly. _ <br />THE FOLLOWING PERSON(S) ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br />_ ........ <br />NAME: Ian Moorhead 11-12. TITLE: Environmental Compliance Manager <br />490-73. <br />NAME: Manlit & Gurpal Grewal 490-74• TITLE: Franchisee <br />490-75. <br />The Designated UST Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />XII. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE DATE: <br />419,-77. <br />REPRESENTING: ❑ 1. Tank Owner/operator ❑ 2. Facility Ow /Operator ®3. Authorized Re resentative of Owner 490-7fi. <br />APPLICANT NAME (print): 490-78' <br />APPLICANT TITLE: <br />49N1-71' <br />Ian Moorhead <br />Env. Compliance Mgr. <br />UPCF UST -D (12/2007) - 3/4 www.unidoes.org <br />