Laserfiche WebLink
kll� <br />UNDERGROL_ ..) STORAGE TANK MON, _ ORING `�. <br />For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br />Authority Cited: Title 23 CCR, Sections 2632(d)(1), 2634(d)(2), and 2641(h) S� � -UU0 <br />TYPE OF ACTION ❑ 1. NEW PLAN ® 2. CHANGE OF INFORMATION ENV1R0f11Xv1j' H <br />01. <br />PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. PERNIJGERVIC0 <br />J <br />Moe. <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) - <br />FACILITY NAME 7 -Eleven #19976 <br />M03. <br />FACILITY SITE ADDRESS 1399 N. Main Street M04. <br />CITY Manteca <br />M05. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed in <br />M06. <br />accordance with the equipment manufacturers' instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY ❑ 99. OTHER (Specify): <br />Mol' <br />III. MONITORING LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, <br />line leak detector, monitoring system control panel, etc.). If you already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification <br />form, Hazardous Materials Business Plan map, etc.) which shows all required information, include it with this plan. <br />IV. TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />Mao. <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ® b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />M" - <br />PANEL MANUFACTURER: VeederRoot M12. MODEL#: TLS350 <br />M13. <br />LEAK SENSOR MANUFACTURER: VeeerROot M14. MODEL #(S): 794380-302 <br />MI5. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: MI6. MODEL M <br />M17. <br />IN -TANK PROBE MANUFACTURER: M18. MODEL #(S): <br />M19. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAIL.Y/NIGHTLY ❑ c. WEEKLY <br />M20. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): M21. <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. ❑ c. OTHER (Specify): M22. <br />g•P• g•P• ( P fY)� <br />M23, <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />M24 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M25. <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): M26. <br />M27. <br />❑ 6.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Requires agency approval) <br />❑ 99. OTHER (Specify): <br />Meg. <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />Mao. <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />M31' <br />PANEL MANUFACTURER: VeederRoot M32. MODEL#: TLS350 <br />M33. <br />LEAK SENSOR MANUFACTURER: VeederRoot M34. MODEL #(S): 794380-208 <br />M35. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? ® a. YES ❑ b. NO <br />M36. <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a. YES ❑ b. NO <br />M37- <br />0 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED <br />MLLDMANUFACTURER(s): VaDroleSS & Redjacket M38. MODEL #(s): LD2000 & FX1V <br />M39. <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />ELLD MANUFACTURER: Mao. MODEL #: <br />M41. <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />M42. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M43. <br />WILL ELLD FAILURF/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M44. <br />® 4. INTEGRITY TESTING <br />TEST FREQUENCY: ® a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) M45. <br />M46. <br />❑ 5.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY* ❑ c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED** <br />M47. <br />* Requires agency approval ** Allowed for monitoring of unburied emergency generator fuel piping only per HSC §25281.5(b)(3) <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ 99, OTHER (Specify) <br />Mas. <br />UN -022A -1/3 www.unidocs.org Rev. 10/14/03 <br />