My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
INSTALL 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 9:08:41 PM
Creation date
8/8/2019 4:35:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j A, 1 1993 <br /> 0INCORPORATED 1970 <br /> LC UNDERWRITERS' LABORATORIES OF CANADA <br /> General Offices and T"t1n9 Station 7 CROUSE ROAD,SCARBOROUGH.ONTARIO.CANADA MIR 0A9 Telephone(418)757.811 Fax 757.9540 <br /> In Rep;pnq <br /> %eCst Reef 1II CMH1422 <br /> December 30, 1992 <br /> Mr. Jim Lawrence <br /> Executive Vice President <br /> Total Containment Inc. <br /> InA Commerce Drive <br /> Exton, PA 19341 <br /> U. S . A. <br /> Subject: Enviro Flex Secondary Containment Piping <br /> Dear Jim: <br /> This is in response to your letter of December 29, 1992, regarding the <br /> certification of the subject product. <br /> In adding the Enviro-Flex Secondary Containment Piping to the Follow-Up <br /> Service Procedure, CMH1422, Volume I, we had confirmed that the piping <br /> met all the requirements for this type of product as documented in <br /> UI.0/ORD-C107.19-1992, Secondary Containment of Underground Piping for <br /> Flammable and Combustible Liquids. Although the testing and <br /> certification of the piping preceded the published requirements, the <br /> investigation of the piping was used as a basis for the documented <br /> requirements. <br /> In revising the Follow-Up Service Procedure, asterisks are used to <br /> indicate the changes made. A note to this effect is on the bottom <br /> right-hand corner of each page in small print, i.e. "Changes indicated <br /> by <br /> We trust that the foregoing is the explanation requested.. If we may be <br /> of further assistance to you, please contact us. <br /> Yours very truly, <br /> George Unger, P. Eng. <br /> Project Engineer <br /> Appliances and Equipment <br /> GU/ai <br />
The URL can be used to link to this page
Your browser does not support the video tag.