My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
INSTALL 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 9:08:41 PM
Creation date
8/8/2019 4:35:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��.�� our X07-37137 JAMES L WHELDEN PACE 04/05 <br /> DOUBLE WALL TANKS <br /> Pioneering Prirnaryla?"y Containment Systems <br /> Testing <br /> Tan.). shall be factory air tested iii accordance with UL require- <br /> ments. Tank shall be shipped with minimum tenAnches loin/hg <br /> vacuum secured on the interstitial:space evidenced by factory in- <br /> stalled vacuum gauge. Vacuum gauge shall be loosened slightly to <br /> assure that gauge is operational. If gauge is operational, then note <br /> new vacuum reading on installation notes and no aboveground air <br /> test is required_ If the gauge is not operational or if local or state <br /> rep <br /> ,1-. require, then an aboveground job site air test shall be <br /> performed. <br /> The aboveground air test must be performed in strict accordance <br /> "-ith instructions provided by the manufacturer. Note following <br /> final .nctallation, another air test or hvdrostatic test may be re- <br /> duii-od by local and/or state regulations. If any leak is detected, <br /> con•act the tank manufacturer for repairs. <br /> Tank Installation <br /> 1n,;tni1ntion shall be in strict accordance with manufacturer's writ- <br /> r� -� iisli-uctions and in accordance with applicable local, state, and <br /> fvdf•r;31 regulations. The installation check list provided by the <br /> ni:,r:1,±;t,•turer shall be completed as the installation progresses. <br /> opies shall be provided to the engineer and the tank owners. <br /> Warranty Registration <br /> Ei, .i. 'ink shall be provided with a thirty (30)year Limited War- <br /> rd n.,. The tank installer shall complete the "Total Containment <br /> Inc warranty and:-shall send directly to Total Containment Inc. <br /> TC1 tank warranties become void if the prop materials are not <br /> use:], the instructions outlined are not foOo "elactly, or the Tank <br /> Installation Checklist and Certificate of ApOhcation are not com- <br /> pleted and returned to TCI. A copy of thecompleted card shall be <br /> provided to the supervising enginieer 46d-the tank owner. <br /> T0,F 11 .# <br /> COwIAIN ..M1,,AT <br />
The URL can be used to link to this page
Your browser does not support the video tag.