Laserfiche WebLink
Thuy Tran [EH] <br /> From: Ana Contreras<Ana.Contreras@ci.tracy.ca.us> <br /> Sent: Monday, October 08, 2012 11:03 AM <br /> To: Kasey Foley[EH]; Raymond von Flue[EHj;Thuy Tran[EH] <br /> Cc: Willy Ng [EHj; Linda Turkatte[EH] <br /> Subject: RE: Building Demolition on 11th St Tracy <br /> Thank you all for your input. It is greatly appreciated. <br /> From: Kasey Foley [EH] [mailto:KFoley@sicehd.com] <br /> Sent: Monday, October 08, 2012 10:01 AM <br /> To: Raymond von Flue [EH]; Thuy Tran [EH] <br /> Cc: Willy Ng [EH]; Linda Turkatte [EH]; Ana Contreras <br /> Subject: RE: Building Demolition on 11th St Tracy <br /> Ray, <br /> Thanks for going to the meeting and providing such detailed notes and research. <br /> Thuy, please keep me in the loop on what's going on at those locations. <br /> Thanks, <br /> Kasey <br /> From: Raymond von Flue [EH] <br /> Sent: Thursday, October 04, 2012 2:20 PM <br /> To:Thuy Tran [EH] <br /> Cc: Kasey Foley [EH]; Willy Ng [EH]; Linda Turkatte [EH]; Ana Contreras (ana.contreras(.aci.tracy.ca.us) <br /> Subject: Building Demolition on 11th St Tracy <br /> Thuy, <br /> I met with City of Tracy Code Enforcement, Building Dept., Police, Planning, and Public Works today. The property in <br /> question has seven parcels. The addresses used are 3 E. 11th, 15 E. 11th,35 E. 11th,47 E. 111h and 49 E. 11th. Two other <br /> parcels are 1120 N. Holly and 1121 N. EI Portal. The north side of the properties is flanked by AT&T. The buildings near <br /> 11th St. have major structural problems and are the main concern for the COT. I went there with Code Enforcement and <br /> visually inspected all of the accessible walls of the buildings. There are four buildings total on three parcels. On the east <br /> side of the building on the 1120 N. Holly parcel has two vent lines on the building. There was also a containment sump <br /> on the adjacent parcel 1121 N. EI Portal for washing vehicles. <br /> I have attached the contact information for Ana Contreras, Code Enforcement Manager and Scott Owen,Supervising <br /> Building Inspector. I informed them of what a UST removal would require and gave them a blank copy of a permit <br /> application. Code Enforcement will be meeting with the property owner and contractor today at 4pm. I also requested <br /> that we could inspect the inside of the buildings for hazardous waste/materials and look further for evidence of possible <br /> UST(s). <br /> A demolition permit was issued without building dept's input. The contractor is a roofing contractor and they are <br /> suspect that they don't have a solid plan of demolishing the buildings safely. The contractor has until Oct 15 to submit <br /> all of the required information to them or they will rescind the permit. They tentatively have considered that the <br /> contractor would not be able to start work, once all necessary information has been received, until the Thanksgiving <br /> Holidays. A High School and an elementary school are nearby and they are considering the traffic that would be caused <br /> by this work. <br /> t <br />