APPLICATION FOR UNDERGROUND STORAGE TANK
<br />CLOSURE PERMIT
<br />GENERAL INSTRUCTIONS:
<br />[ ] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the
<br />applicant with comments.
<br />[ ] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, streets,
<br />adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water wells, buildings,
<br />underground public utility lines (including water, sanitary sewer and storm sewer), and distance of piping from
<br />tank to dispensers. If underground utilities are not included on the site map, you must state in writing that USA
<br />Dig will be contacted prior to excavation activities.
<br />[ ] 3. Complete pages 3-5, "Application for Underground Storage Tank Closure Permit". Not : Sampling firm
<br />shall be an independent third party from the contractor.
<br />[ ] 4. Complete page 8, "Authorization to Release". This form must be signed and dated by the
<br />OWNER/OPERATOR of the facility.
<br />[ ] 5. Submit a "Service Request' form with the appropriate fees, submit completed UPC forms for Facility and Tanks
<br />(formerly State A & B forms) and complete the "Underground Storage Tank Program Fee Worksheet'.
<br />[ ] 6. Complete all questions on page 9, the Environmental Health Department (EHD) "Underground Storage Tank
<br />Disposition Tracking Record", except those requiring a signature and date of tank removal. The holder of the
<br />permit shall be responsible for ensuring that this form is completed and returned to EHD within 30 days of the
<br />tank removal.
<br />[ ] 7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential hazards for
<br />this specific job site. Refer to the Site Safety Plan Guidance Document for specifics.
<br />(] 8. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required by the
<br />County of San Joaquin Building Department and the incorporated City Building Departments, pursuant to the
<br />Uniform Building Code STD 70-11.
<br />[ ] 9. Obtain a "Grading and Excavation Permit' from the City of Tracy Building Division prior to the Environmental
<br />Health Department (EHD) approval of the closure plan.
<br />[ ] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed
<br />plan. If gross deficiencies are identified, an addendum will be required with a $125.00/hour fee and the review will
<br />begin on the date of resubmittal.
<br />11. Submit verification of the fire permit from the appropriate fire district at the removal inspection
<br />12. Advance inspection notice of at least 48 hours is required by EHD.
<br />13. If planning to over -excavate at time of UST removal, see "III. SITE MITIGATION" on Page 2
<br />EH 23 046 (Revised 8/1/11)
<br />FILA' COPY
<br />I (L E Wivd `/
<br />San Joaquin County
<br />Environmental Health Department
<br />DIRECTOR
<br />600 East Main Street
<br />Donna I-leran, REHS
<br />Stockton, California 95202-3029
<br />PROGRAM
<br />COORDINATORS
<br />Robert McClellon. REHS
<br />Website: www.sjgov.org/ehd
<br />Jeff Carruesco, REHS, RDI
<br />Phone: (209) 468-3420
<br />Kasey Foley, REHS
<br />Fax: (209) 464-3433
<br />APPLICATION FOR UNDERGROUND STORAGE TANK
<br />CLOSURE PERMIT
<br />GENERAL INSTRUCTIONS:
<br />[ ] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the
<br />applicant with comments.
<br />[ ] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, streets,
<br />adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water wells, buildings,
<br />underground public utility lines (including water, sanitary sewer and storm sewer), and distance of piping from
<br />tank to dispensers. If underground utilities are not included on the site map, you must state in writing that USA
<br />Dig will be contacted prior to excavation activities.
<br />[ ] 3. Complete pages 3-5, "Application for Underground Storage Tank Closure Permit". Not : Sampling firm
<br />shall be an independent third party from the contractor.
<br />[ ] 4. Complete page 8, "Authorization to Release". This form must be signed and dated by the
<br />OWNER/OPERATOR of the facility.
<br />[ ] 5. Submit a "Service Request' form with the appropriate fees, submit completed UPC forms for Facility and Tanks
<br />(formerly State A & B forms) and complete the "Underground Storage Tank Program Fee Worksheet'.
<br />[ ] 6. Complete all questions on page 9, the Environmental Health Department (EHD) "Underground Storage Tank
<br />Disposition Tracking Record", except those requiring a signature and date of tank removal. The holder of the
<br />permit shall be responsible for ensuring that this form is completed and returned to EHD within 30 days of the
<br />tank removal.
<br />[ ] 7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential hazards for
<br />this specific job site. Refer to the Site Safety Plan Guidance Document for specifics.
<br />(] 8. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required by the
<br />County of San Joaquin Building Department and the incorporated City Building Departments, pursuant to the
<br />Uniform Building Code STD 70-11.
<br />[ ] 9. Obtain a "Grading and Excavation Permit' from the City of Tracy Building Division prior to the Environmental
<br />Health Department (EHD) approval of the closure plan.
<br />[ ] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed
<br />plan. If gross deficiencies are identified, an addendum will be required with a $125.00/hour fee and the review will
<br />begin on the date of resubmittal.
<br />11. Submit verification of the fire permit from the appropriate fire district at the removal inspection
<br />12. Advance inspection notice of at least 48 hours is required by EHD.
<br />13. If planning to over -excavate at time of UST removal, see "III. SITE MITIGATION" on Page 2
<br />EH 23 046 (Revised 8/1/11)
<br />
|