Laserfiche WebLink
Gabriel Gonzalez [EH] <br />From: Brian Millman <bmillman@advgeoenv.com> <br />Sent: Friday, October 24, 2014 10:02 AM <br />To: Gabriel Gonzalez [EH] <br />Subject: RE: 47 E. 11th St., Tracy Work Plan <br />Attachments: Levand Property PSA Work Plan 0914-FINAL-county.pdf <br />Hello Gabriel. <br />I revised Table 1 to reflect the accurate concentration of total xylenes in SP2-East. I also revised the text to <br />correlate with the proposed boring locations depicted in the site plan. <br />The revised report is attached. I am in the process of getting authorization (from client and GeoTracker <br />website) to upload the work plan and all future documents to GeoTracker. As soon as authorization is <br />approved we will upload the plan immediately. <br />Thank you for your assistance with this project. <br />Brian W. Millman <br />California Professional Geologist #8574 <br />Advanced GeoEnvironmental, Inc. <br />Stockton • Los Angeles • San Francisco Bay Area - <br />Monterey • Spokane • Seattle • Portland • Reno • Dallas <br />Phone: 800-511-9300 <br />Fax: 888-445-8786 <br />bmillman(a)-advgeoenv com <br />www.advgeoenv.com <br />This email/fax message is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, <br />use, disclosure or distribution of this email/fax is prohibited. If you are not the intended recipient, please contact the sender by emaillfax and destroy all <br />paper and electronic copies of the original message <br />From: Gabriel Gonzalez [EH] (mailto•gagonzalezftce ml <br />Sent: Thursday, October 23, 2014 2:43 PM <br />To: Brian Millman <br />Subject: RE: 47 E. 11th St., Tracy Work Plan <br />Hi Brian, <br />In addition to the miscalculation in Table 1 of the Preliminary Site Assessment Work Plan as described in the email <br />below, please adjust the site plan's proposed soil boring locations so that they are more accurately depicted, to scale, as <br />described in page 4 of the work plan. For example, the work plan states borings "...will be advanced approximately 15 <br />feet to the east and 25 feet west of the UST excavation..." However, the site plan depicts the proposed boring to the <br />west much closer to the UST excavation than the proposed boring to the east. <br />Please make necessary corrections and submit the work plan to GeoTracker at your earliest convenience. <br />Thank you, <br />r-nk ;_I <br />