Laserfiche WebLink
30 July 2007 <br />AGE NC Project No. 03=1055 <br />Page 9 of 9 <br />3:5.. BORING ABANDONMENT AND WASTE MANAGEMENT <br />Following borehole advancement; portland cement (grout mix) will: be utilized to backfill each <br />borehole utilizing a tremie ,pipe under EHD oversight. <br />Cuttings and rinseate generated during drilling activities will be containerized in properly labeled <br />Department of Transportation (DOT) -approved 55=gallon'drums, or equivalent and stored on-site <br />in an area lacking public access. Disposal alternatives will be evaluated based on results of soil and <br />water analysis. All soil borings will be backfilled over their entire depth with a portland cement grout <br />mix. <br />Advanced GeoEativiroemental, iee. <br />