Laserfiche WebLink
• <br />• <br />21 August 2003 <br />AGE -NC Project No 03-1055 <br />Page 11 of 10 <br />All sampling tools used for sample collection will be thoroughly washed with a solution of Alconox <br />and rinsed with clean water prior to use All down -hole dnlling and sampling equipment will be <br />pressure washed prior to starting each boring Cuttings generated during drilling and nnseate <br />generated during drilling and ground water sampling activities will be containerized In properly <br />labeled DOT -approved 55 -gallon drums, and stored on-site In an area lacking public access Disposal <br />alternatives will be evaluated based on results of soil and water analysis <br />Advanced GeoEnv►ronmental, Inc <br />