Laserfiche WebLink
• Phase II Site Assessment Work Plan <br /> Former TRACY DINER <br /> 95 West I Vh Street, Tracy, Caldornia <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 2.0. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 21 REGIONAL GEOLOGICIHYDROGEOLOGIC SETTING 2 <br /> 2 2 UNDERGROUND STORAGE TANK REMOVAL 3 <br /> 23 PREVIOUS SUBSURFACE INVESTIGATION 3 <br /> 24 SOIL EXCAVATION 4 <br /> 3.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 31 PRE-FIELD WORK TASKS 5 <br /> 32 SOIL SAMPLE COLLECTION AND ANALYSIS 5 <br /> 3 3 GRAB GROUND WATER SAMPLE COLLECTION AND ANALYSIS 5 <br /> 34 REPORT PREPARATION 6 <br /> 4.0. FIELD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 41 PROBE BORING ADVANCEMENT 6 <br /> 4 1 1 Soil Sampling Procedures 6 <br /> 4 12 In-situ Ground Water Sampling Procedures 7 <br /> 42 EQUIPMENT DECONTAMINATION 7 <br /> 43 BORING ABANDONMENT 7 <br /> 5.0 REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 -Proposed Boring Locations <br /> Advanced GeoEnvironmental,Inc. <br />