Laserfiche WebLink
Advanced GeoEnvironmental, Inc <br />. Site Health and Safety Plan <br />Page 4 of 7 <br />6.0. ON-SITE WORK PLANS <br />Work party(ies) consisting of two persons will perform the following tasks <br />Project Team Leader: <br />Task: <br />William Little <br />Over site <br />Work Party 41: <br />Task: <br />Operate equipment <br />advance borings <br />Technician (if nec } <br />Clean equipment <br />0 The works party(ies) were briefed on the content of this plan at the site on <br />i <br />7.0 COMMUNICATION PROCEDURES <br />If hearing is impaired, the following standard hand signals will be used <br />Hand gripping throat <br />Out of air, can not breath <br />Grip partner's wrist or both hands around waist <br />Leave area immediately <br />Hands on top of head <br />Need assistance <br />Thumbs up <br />OK I am alright, I understand <br />Thumbs down <br />No negative <br />AGE NC SHSPlur2 04cmM 2000 <br />