Laserfiche WebLink
t I v-neuron u 5 A. vroaucts C.ornpany, w3 west 7 7tn bt, i racy, uA uccooer 14, jVbK <br /> Periodic measurements of pH, conductivity and temperature will be collected during development <br /> The wells will be developed until well water is visibly clear <br /> Top of casing (TOC) and horizontal position of the wells will be professionally surveyed relative to an <br /> established local bench mark or an arbitrary on-site datum <br /> TASK 4- REPORT PREPARATION <br /> Groundwater Technology will prepare a report summarizing the data collected under the scope of <br /> work detailed above The report will document the methods and results of the work, summarize <br /> laboratory analytical results, and include appropriate maps <br /> Please contact our West Sacramento office at 916-372-4700 if you have questions or comments <br /> about this work plan <br /> Sincerely, <br /> Groundwater Technology, Inc Groundwater Technology, Inc <br /> OSubmitted by Approved by <br /> IJCE BEALE joject <br /> N M FEDOTA <br /> Associate Geologist Geologist <br /> Manager <br /> Attachments <br /> 1 Figure 1 - Site Map with Well Locations <br /> 2 Figure 2 - Typical Detail, Monitoring Well Construction <br />