My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
239
>
2900 - Site Mitigation Program
>
PR0536561
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:01 AM
Creation date
8/12/2019 2:45:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536561
PE
2961
FACILITY_ID
FA0020992
FACILITY_NAME
IN-SHAPE HEALTH CLUB
STREET_NUMBER
239
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23311303
CURRENT_STATUS
01
SITE_LOCATION
239 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />TABLE OF CONTENTS <br />0 <br />LIMITED PHASE 11 ENVIRONMENTAL SITE ASSESSMENT WORK PLAN <br />IN -SHAPE HEALTH CLUB <br />239 WEST 11TH STREET <br />TRACY, CALIFORNIA <br />PROJECT NO. 2E-1108004 <br />Section No. Description <br />pane No. <br />1. INTRODUCTION............................................................................................................1 <br />1.1. Objective and Purpose..................................................................................... <br />1 <br />1.2. Site Location and Setting...........................................................•..................... <br />1 <br />2. TECHNICAL APPROACH AND SCOPE OF SERVICES...............................................2 <br />2.1. Technical Approach.......................................................................................... <br />2 <br />2.2. Scope of Services............................................................................................. <br />2 <br />3. PRELIMINARY SITE ASSESSMENT METHODS AND PROCEDURES ........................ <br />3 <br />3.1. Soil Sampling Methods ......................... <br />3.1.1. Direct -push Soil Sampling Methods......................................................... <br />4 <br />3.1.2. Soil Field Screening and Analysis............................................................ <br />5 <br />3.2. Groundwater Sampling Methods...................................................................... 5 <br />3.2.1. Temporary Wells and Sampling............................................................... <br />5 <br />3.3. Decontamination Procedures........................................................................... <br />5 <br />3.4. Borehole Abandonment.................................................................................... 6 <br />3.5. Site Assessment -Derived Waste Management ................................................. 6 <br />3.5.1, Soil Cuttings Management.......................................................................6 <br />3.5.2. Purge and Development Water Management .......................................... <br />6 <br />4. SCHEDULE........................................................................................................................ 6 <br />LIST OF FIGURES <br />Figure 1: Site Location Map <br />Figure 2: Proposed Boring Location Plan <br />APPENDICES <br />Appendix A Important Information About Your Geoenvironmental Report <br />© GILES ENGINEERING ASSOCIATES, INC. 2011 <br />GILES ENGINEERING ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.