PRODUCT PIPING REPLACEMENT <br /> March 23,2001 <br /> Shell Facility <br /> 4315 E. Waterloo Rd. <br /> Stockton,CA <br /> I <br /> WORKPLAN <br /> Replace all primary and secondary piping for 87 and 92 products._ Replace all sump penetration <br /> boots. New pipe will match existing. (A.O. Smith) <br /> REMEDY <br /> To ensilre compliance with future secondary piping pressure testing requirement, replacing the <br /> existing piping is appropriate as this time. <br /> The plan is to begin piping replacemen4`STIon M h 26,2001. <br /> y V <br /> ----------- <br /> lo <br /> .. ..... i <br /> Q 1 Vf ���lll VVV <br /> SITE PLAN <br /> A T Slab <br /> I' Dive Slab (, <br /> It 0 <br /> ® � o Pig <br /> 73 <br /> - w. <br /> acs <br /> No <br /> a.P40 <br /> } <br />