My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
3500 - Local Oversight Program
>
PR0545859
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 5:14:41 PM
Creation date
8/15/2019 11:31:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545859
PE
3528
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
02
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMBRIA <br /> Method 8020 or equivalent, and fuel oxygenates (MTBE, TAME, DIPE, ETBE, and TBA), <br /> 1,2-dichloroethane, and 1,2-dibromoethane by EPA Method 8260. <br /> Receptor Survey: Cambria will conduct a survey to identify water-producing wells and surface <br /> water bodies within a 2,000-foot radius of the subject site. Cambria will review maps and <br /> California Department of Water Resources' records of the area and perform field reconnaissance <br /> to identify the receptors. <br /> Report Preparation: Following the receipt of analytical results from the laboratory, Cambria <br /> will prepare a written report which will include field procedures, laboratory results, boring logs, <br /> receptor survey results, and conclusions. <br /> The scope of work described in this work plan will be performed under the supervision of a <br /> registered geologist. <br /> SCHEDULE <br /> Cambria will schedule field work within 60 days of receiving work plan approval and the drilling <br /> permit from SJCPHS/EHD, and we will submit a report within 60 days of completing the field <br /> work. Cambria will notify SJCPHS/EHD of the field schedule at least 48 hours (two working <br /> days)prior to commencing field work. <br /> If you have any questions regarding the scope of work outlined in this work plan, please call <br /> Aubrey Cool at(707) 933-2368. <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> QED GFO <br /> Aubrey K. Cool A, ANA <br /> Project Geolo ist Gj <br /> FRIEL G) <br /> CD <br /> UJ <br /> cr <br /> Joe W.Neely Exp. s . <br /> tic. 6452 <br /> Senior <br /> eRG 6927roject Geologist sTgrF OF CAL�F���P <br /> 1359 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.