Laserfiche WebLink
't <br /> ~ SHELL WELL MONITORING DATA-SHEET <br /> BTS #- 03/o.3o Site 170,77GrU <br /> Sampler Date: J01101,93 <br /> ss <br /> Wel} i D ,rte- Z Well Diameter 2 3 6 8 <br /> Total Well Depth 7/,.� Depth to Water 61,yO <br /> Depth to Free Product _ Thickness of Free Product (feet)- <br /> Referenced to Pvc _ Grade u µ D G Meter (if req'd). Y-SI _ HACH <br /> DTW with 80% Recharge [(Height_of Water Column x 0.20_ ) +DTW] 7o,l _4 <br /> Purge Method Bailer/ Waterra � Sampling Method Baller <br /> Disposable Bailer Peristaltic Disposable Baiter <br /> Middleburg Extraction Pump Extraction Port <br /> Electric Submersible Other Dedicated Tubing <br /> Other <br /> Wel Diameter tie Well Diamee ulh er <br /> t" 004 4- 065 ' <br /> �(oals)X C32ls 2*- 016 6" 147 <br /> l Case Volume Specified Volumes Calculated Volume 1' 037 Other radreisi'0 163 <br /> Temp Coed Turbidity <br /> Time (°F) pH (mS or (NTUs) Gals.Removed Observations <br /> 9 1 vcac� <br /> Did well dewater? Yes o Gallons actually evacuated 3 <br /> Sampling Date/, � Sampling TimeDepth to Water o /a <br /> Sample I D Laboratory s K FF Other <br /> Analyzed for. PH- TE T$ THP-d Oxygenates Other <br /> EB I.D (if applicable)- @ Time Duplicate I D (if applicable) <br /> Analyzed for TPH-g BTEx MTBE THP-d Oxygenates Other <br /> DO (if req'd) Pre-purge mg/L Post-purge mg! <br /> OR P (if req'd)• Pre-purge MV Post-purge mV <br /> i <br />