Laserfiche WebLink
WELL MONITORING DATA SHEET <br /> Project # p f o [ l 6 - !c l Client- F ,,,•,,,� <br /> iSampler 13 Start Date 1-14 -01 <br /> Well I D Well Diameter 3 4 6 S <br /> Total Well Depth 7 3 -7 / Depth to Water , Ll 0 <br /> Before After Before After <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Referenced to vC Grade D O Meter (if req'd) YSl HACH <br /> Purge Method Sampling Method CBai e <br /> aile Waterra Disposable Bailer <br /> Disposable Bailer Peristaltic Extraction Port <br /> Middleburg Extraction Pump Dedicated Tubing <br /> Electric Submersible Other Other <br /> Well Diameter MultuAler Well Diameter Multi leer <br /> 1" 004 4" 065 <br /> (Gals)X 3 — —7. Gals z" 0 16 6" 147 <br /> I Case Volume Specified Volumes Calculated Volume 3" 037 other radius'*0 163 <br /> Time Temp (°F) pH Cond Turbidity Gals Removed Observations <br /> C)&I % 6 ).3 7. 2 r I3U > 1) 00 ). . r <br /> C? f-(I i Iq 7. 1 11I r -7 -) 00 r 0 « <br /> /003— >;X1.0 -7 7 ) NO 60 -7- � {r <br /> Did well dewater? Yes <291 Gallons actually evacuated- -7. <br /> Sampling Time 10 f0 Sampling Date / - (( -Of <br /> Sample I D w1u., - 1 Laboratory- Je <br /> Analyzed for- TPH-Q Tnzz TB TPH-DCher ,i T l3 C <br /> Equipment Blank LD . @ r=r Duplicate I D <br /> Analyzed for TPH-G BTEX MTBE TPH-D Other <br />. DO (if req'd) Pre-purge mg/L Post-purge mb/L <br /> ORP (if req'd)- Pre-purge mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />