My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
23577
>
2900 - Site Mitigation Program
>
PR0522619
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2019 1:59:50 AM
Creation date
8/16/2019 11:55:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522619
PE
2950
FACILITY_ID
FA0015410
FACILITY_NAME
CHARLIE SPATAFORE PROPERTY
STREET_NUMBER
23577
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
Zip
953049600
APN
20908026
CURRENT_STATUS
01
SITE_LOCATION
23577 MOUNTAIN HOUSE PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval of Final or Parcel Map. <br /> 19. Geotechnical Report:All infrastructure designs shall be shown on the grading and <br /> improvement plans and shall comply with and incorporate the recommendations of the <br /> Geotechnical Engineering Studies. Condition shall be met before approval of Final or Parcel <br /> Map. <br /> 20. Environmental Hazards: Comply with all recommendations of the Environmental Site <br /> Assessment prepared for the project. Condition shall be met prior to beginning any <br /> construction on the related Final or Parcel map. <br /> 21. Agricultural Drainage Improvement Phasing:A Surface and Subsurface Drainage Facilities <br /> Relocation and Improvement Plan for Mountain House Business Park and adjacent areas <br /> shall be submitted to and approved by BBID and Mountain House Community Services <br /> District(MHCSD)General Manager. The plan shall include but not be limited to the following: <br /> A. Phasing for relocation and improvement of surface and subsurface drainage facilities; <br /> B. Locations and timing; <br /> C. Identification of"dewatering" areas and temporary or permanent methods for the <br /> dewatering system and connections to the storm water collection system as <br /> determined necessary by the plan; <br /> D. BBID Encroachment Permits. <br /> Condition shall be met, as approved by the MHCSD General Manager, prior to approval <br /> of the first Final or Parcel Map. <br /> 22. The developer shall prepare an SB 221 report to address the community's potable water <br /> supply needs prior to filing of any of the project's Final or Parcel Maps. <br /> 23. Prior to issuance of the first building permit,the developer shall comply with the most recent <br /> update of the MHTIF and of the Community Facilities Fee(CFF)Plan as determined by the <br /> MHCSD. <br /> 24. The conditions of approval that are in any prior approved Tentative map within the Mountain <br /> House Master Plan area will be coordinated to offset or reduce any overlapping conditions of <br /> this map. <br /> 25. Fire Station: Prior to filing of the Final or Parcel map, if detennined by the General Manager, <br /> fire mitigation measures shall be provided that satisfy the Fire Protection plan as determined <br /> by the General Manager. <br /> A. 12 months prior to the start of construction on a building greater in height than three <br /> stories, the party issued the building permit will pay to MHCSD the full cost of a new fire <br /> ladder truck bulk to specifications and equipped as determined by the MHCSD. <br /> B. If construction is begun on a building greater in height than three stories prior to June 30, <br /> 2012,the party issued the building permit will pay to MHCSD a dollar amount equal to <br /> Salaries and benefits for 11 fire personnel positions and all associated supplies, <br /> equipment and training, as determined by the MHCSD, for each fiscal year or portion <br /> thereof for the period beginning 6 months prior to the start of construction through June <br /> 30, 2012. <br /> 26. Corporation Yard Facilities: Construction shall begin prior to issuance of the 4,500" building <br /> permit, unless the MHCSD General Manager determines that the facilities are not yet <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.