My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
23577
>
2900 - Site Mitigation Program
>
PR0522619
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2019 1:59:50 AM
Creation date
8/16/2019 11:55:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522619
PE
2950
FACILITY_ID
FA0015410
FACILITY_NAME
CHARLIE SPATAFORE PROPERTY
STREET_NUMBER
23577
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
Zip
953049600
APN
20908026
CURRENT_STATUS
01
SITE_LOCATION
23577 MOUNTAIN HOUSE PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Purpose Plan. Timing: Prior to first Final Map. <br /> B. Site furniture, consistent with the common design theme of Mountain House <br /> Business Park,shall be incorporated into the Improvement Plans and shall be <br /> consistent with the MHCSD Design Manual. The site furniture shall be a part of the <br /> design plans and shall comply with all Community Approvals including applicable <br /> provisions of the MHCSD Design Manual. Timing: Plans shall be reviewed and <br /> approved by MHCSD prior to the approval of the first building permit. <br /> C. Pedestrian, Bicycle and Transit Plan shall include a Class I Multi-Use Path on the <br /> west side of Mountain House Parkway and all other path systems called for in <br /> MHCSD Design Manual within the Mountain House Business Park area. All <br /> Pedestrian, Bicycle and Transit Facilities shall be consistent with all Community <br /> Approvals including applicable provisions of the MHCSD Design Manual and any <br /> applicable Special Purpose Plan. Timing: Prior to first Final Map. <br /> D. Spatafore Parkway, Central Parkway,and all Road Street Sections shall meet <br /> MHCSD Standards including provisions for and minimum standard dimensions within <br /> Parkway areas between curb and sidewalk. Timing: Prior to first Final Map. <br /> E. The design of Simulated Bridges on public street ROW shall be developed to match <br /> the Landscaping and architectural Civic Italianate design of existing Mountain House <br /> Bridges. Timing: Prior to first Final Map. <br /> F. All Roadway, Streetscape, and Landscaping shall be designed consistent with all <br /> Community Approvals including applicable provisions of the MHCSD Design Manual. <br /> All street ROW lines, easements and toe of slope lines shall be indicated on the <br /> Plans. Timing: The design plans associated with each phase of the development <br /> shall be completed and approved by the MHCSD General Manager prior to the <br /> approval of the Final Map for that phase. <br /> G. The roadway landscape construction plans shall be processed and approved by the <br /> MHCSD General Manager concurrently with the Improvement Plans for any phase of <br /> the Mountain House Business Park development. <br /> H. The collector street network and landscape treatments shall comply with all <br /> Community Approvals including applicable provisions of the MHCSD Design Manual <br /> and MHCSD Standards. <br /> 1. Community Walls, consistent with the MHCSD Design Manual and MHCSD <br /> Standards,shall be constructed along the residential edge of De Anza Boulevard. <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to first building <br /> permit. <br /> J. Alignment for De Anza Blvd. Community Wall and all Community Walls located along <br /> Arterial Streets shall undulate and shall be consistent with all Community Approvals <br /> including applicable provisions of the MHCSD Design Manual and MHCSD <br /> Standards. Property lines shall follow the alignment of the Community Walls. <br /> Timing: Prior to First Final Map. <br /> K. The applicant shall design the Community Gateway Element, to be located in the <br /> area northwest of Mountain House Parkway and 1-205 freeway, or the Developer <br /> shall combine this Community Gateway Element with the proposed MH Business <br /> Park Pylon Sign Structure. <br /> If the Community Gateway Element and the MH Business Park Pylon Sign Structure <br /> are developed as two(2)separate structures,the height of the Pylon Sign shall not <br /> exceed the height of the Community Gateway Monument. The architectural style for <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.