Laserfiche WebLink
0 LCC��OMC�D <br /> AUG 3 12005 <br /> Harlin here is the Draft Workplan for the Mountain House Chevron spill. <br /> ENVIRONMENT HEALTH <br /> PERMIT/SERVICES <br /> It is in Draft form since excavating around the Chevron and PG&E pipelines is subject to <br /> these two companies health and safety policies etc. I have been in contact with both <br /> companies and will call you with any relevant changes to excavation around their <br /> pipelines. <br /> I know Chevron would like to repair their pipline in about mid October, so we will need <br /> to coordinate with them if we plan on excavating beneath their pipeline. I am pretty sure <br /> however Mike will want to proceed with other elements of the workplan prior to that time <br /> if possible. Thanks for your help. <br /> Doug Heard, P.G. <br /> Senior Geologist <br />