Laserfiche WebLink
1 <br /> Chronology of remedial actions for Former Regal Station R603, 6425 Pacific Avenue, <br /> Stockton, California 95207 <br /> October 24, 1988 Ust's and dispensing piping removed, first discovery of gasoline <br /> tainted soil. <br /> December 9, 1988 Workplan to drill and sample six exploratory borings and install 3 1 <br /> groundwater monitoring wells (MW 1, MW2 and MW3). I( <br /> March '), 1989� Installation of additional seven groundwater monitoring wells, <br /> i <br /> delineation of groundwater plume (MW4, MW5, MW6, MW7, MW8, <br /> MW9, and MW10). <br /> October 10, 1989 Installed pumps into MWI and MW3 for free product removal, <br /> recovered 40 gallons of gasoline and reduced thickness of product in <br /> wells from 1.26 feet at MWI and 1.66 feet at MW3 to a sheen. <br /> July ')1, 1990 Submit Remedial Action Plan to San Joaquin County Health. <br /> January 15, 1991 Vapor extraction source test. <br /> January 23, 1991 Public comment period for Remedial Action Plan ends. <br /> I <br /> October 10, 1991 Start-up of vapor extraction system. <br /> June 2, 1992 Sewer discharge permit approved for 1,200 gallons per day. <br /> September 28;!1 1992 Completion of two downgradient wells (MWI 1, and MW 12). <br /> December 1, 1992 Interim groundwater removal, purging selected wells (MWI, MW2, <br /> MW3, MW8 and MWIO) twice a week until approval to install <br /> continuous pumping system is achieved. <br /> August 30, 1993 Discontinue purging of selected wells after Lincoln Center voiced <br /> concerns that this activity could spread their PCE, TCE, DCE still <br /> undefined plume(s). <br /> i <br /> i <br /> December 22, 1993 Vapor extraction system was turned off, due to concern of San Joaquin <br /> County field inspector the VES may be influencing Lincoln Village <br /> solvent plume. <br /> December 30 1993 Letter from San Joaquin County clarifying that the communications <br /> between the field inspector for the county and WEGE technician was <br /> misconstrued and at our earliest convenience, re-start the VES. And in <br /> fact, the previous periodic groundwater extraction was controlling the <br /> 3 R603 Update#54/CLOSURE 3 12/98 <br /> i <br />