Laserfiche WebLink
I rot.ocol For, Grou„,, water Monitoring woliu <br /> 1'ht l,rtu,ruy lAii,prse for moit,toring well Installation is to provide <br /> ciruundw.rlr•r acce:,s for sampling L-qu.rpment and mortitorinry instruments t.o <br /> i:udhlu WU-1+1 11 if-10ion and qv Ar%1 r f 1c.111on of various constituents - <br /> t,r+•:•, n! wt!l t c•r,rr::t r urt Jan Will depond On the, chemical compoultion Of <br /> th,' .trurinttw,lt�•t' -sysl,ew and contaminants present. Monitoring wells will <br /> IM t++,tn] fc:,t u;,0111 gccupt.ud procedures and materials of construction. <br /> M -h of iha data ruyuired Co determine proper groundwat.or monitoring <br /> W011 i nst„I t c+t lbn WLIJ he Obtained from subsurface soil .,burin+je. ` <br /> General Requiremants „ <br /> In the plac�E:munt of groundwater monitoring walls, eonsidoratior+s must <br /> be given (.o the locution and type of the contaminant, the contaminant <br /> - pDint source(:.) , the groundwater <br /> gradient, flaw direction, flaw <br /> vel-ocity and location of surface obstructions such as private business, <br /> private residences and other demographic considerations. <br /> Cons <br /> truction materials selected, and well design will also' depend on <br /> the above parameters, but may be influenced by many other factors. <br /> These include water and soil corrosivity, ptl, suseptibility of casing <br /> r material Lu degradation from contaminants in or on t'Se groundwater, the <br /> probability of the well being used for pumping or injecting remedial <br /> k. flr,id:i, and the lent7th of bunt, the well is expected to be used. t <br /> i. All,ground water monitoring'and/or remedial wells installed at the Exxon, Inc. <br /> service station, former Regal Service Station 603,,will include consideration <br /> E: of f111 of t-hose parameters. <br /> 1 <br /> i <br /> A 7.,7/8 inch hollow-stem auger will be used .to drill each groundwater <br /> well. Hach well will he dr'11eJ to a depth of approximately 4�0 feet, f <br /> or about. 10 Cert below the prem.nt'. water table. <br /> t well I)e1jt1.P1 <br /> 3 <br /> s {=rncn,dwutui we]];+ ws l] be constructed of pc,lyvinyi chloride (PVC) <br /> casing and slot ted pipe. F'ift.een feet. of factory-machine••slotted <br /> ` casing will be fitted with a cap and placed at the bottom of each of <br /> the borings. The blank pipe w:11 be. connected to the slotted pipe and <br /> extended to approximately 6 inches below the ground surface of each of <br /> j the borings. A locking, protective well covering will 1,hen be <br /> instullud slightly above the paving surface. All lengt,l,s of pipe, both <br /> slot l ed Und blank, will he cannVct.ed by t.hrcaclt tl Joint::. <br /> A 1F, <br /> REPR=Ifw OF IBISCAME BE i <br /> � <br /> ` IMPRCVM ME TO, ZHE f <br /> ITIJN 0]F T ; I1L, <br />