Laserfiche WebLink
CE Monitoring Well Construction Log <br /> PROJECT NUMBER R-6o3 MONITOR WELL NO. - - <br /> PROJECT NAME Regal 603 TOP OF CASING ELE=V. 19.17' above mean sea <br /> level <br /> REMARKS: 15 bags sand, 9 bags cement, 1 bucket pellets <br /> i <br /> S <br /> TYPICAL MONITORING WELL <br /> WELL CONSTRUCTION <br /> . 1, Total depth of boring - 65 <br /> 10" j <br /> 2, Diameter of boring <br /> 4. 3, Casing length <br /> E W 4. Diameter of casing — a" <br /> 5. Depth to.top of screen 36---� <br /> 30' <br /> 6. Length of screen - - <br /> 10. screen Interval 35 -65 <br /> 1 1. 3• screen type machine slot <br /> :E 0.021, <br /> i screen size <br /> 7. Surface seal °later tight trff_ic box <br /> seal material canerete <br /> I - <br /> 6 Backfill 0-75' <br /> backfill material <br /> 251-21 <br /> 9. Upper seal bentonite pellets <br /> seal material <br /> 10, Lovnr Seal ellets <br /> seal material bentonite <br /> 2' 11, Gravei pack2$ <br /> l R3 Clean Monterey <br /> pack materiasand <br />