My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012610
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0012610
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 3:01:29 PM
Creation date
8/21/2019 2:18:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012610
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
622
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'' <br /> t <br /> January 5, 1991 <br /> Mr. john Margowski <br /> Environmental Director <br /> Wickland properties i <br /> 1765 Challenges Way <br /> Sacram921�11Q0 <br /> 5815 <br /> (916) Station 503 <br /> - 5ource Test for vapor extraction, former Regal <br /> RE: 6425 pacific Avenue, Stockton, California. <br /> (EXXON) r <br /> Dear Mr, Margowski: <br /> INTRODUCTION of the s°•�rce test <br /> This letter documents the sc <br /> va or extraction into activated charcoal. at the above <br /> heduled star uP <br /> far P <br /> mentioned site. <br /> PILOT TEST to exist beneath the <br /> drocarbons are known excavation was <br /> Gasoline range by tanks area. The tank 3, 1.991, <br /> undergound storage depth on January <br /> overexcavated to the 26 foot <br /> gallon tub scrubs were delivered <br /> was <br /> activated charcoal inyc two <br /> 8 27-28, 1990, monitor <br /> the site, begin. <br /> which time the test will g <br /> manifolded to the treatment area. The blower rill be installs o <br /> �# January 7, 1991, at <br /> TEST PRCCEDURES one week or until break <br /> proceed for a duration of EX2 <br /> The test will p or extraction wells EBl <br /> through, which ever occurs firatvacaum system (1HP Rotron Blower) <br /> and MW 10 will be connected to <br /> tub scrubs. <br /> that <br /> exhausts into two 85 gallon activated charcoal <br /> at ei <br /> Sample ports will be installed at thehinfluentl to fbthe nblower for <br /> vacuum and temperature readings, and at the exhaust of <br /> temperature monitoring p sample port <br /> samples, vacuum and temp tub scrubs for <br /> the blower for pressure and temperature monitoring <br /> erature readings. The exhaust of the <br /> will also be located on the exhaust of the charcoa breakthrough <br /> samples, pressure and temp that has been <br /> tub scrubs will be checked on alternate <br /> using a hand held photoionizing Once breakthrough occurs <br /> calibrated to 50 ppm Isobutylene in air. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.