Laserfiche WebLink
s <br /> .e�is"✓''. MMjW <br /> � <br /> 1 <br /> 1 <br /> J <br /> IREGE PROJEM REGM,60.3 <br /> 2-10-8,9 <br /> B. Exploratory Borings attd Monitor Well Construction- <br /> WEGF,along with Hogate Drilling, perfornted si,.on site exploratory <br /> borings from Dema ber 1 thru 9, 1988 (B 1,B2, B 3. B4, B5 and 136). <br /> Monitor wells MW-1,mw-2,and MW-3 were constructed fmm borings B4, <br />'r. B5,and B6 respectively. <br /> Tach boring and well was drilled with a truck-rnoanted drilling rig(Hogate <br /> Drilling) using ten inch hollow stem augers. The drilling rig and augers <br /> were steam cleaned prior to use and All lubricated parts that were to enter or <br /> approach the boring were lubricated with olive oil. 'x he sampling equipment <br /> was steam cleaned between each sampling it tetval. <br /> Boring lags were prepared by a WEGE field geologist who was on site <br /> during the drilling and sampling. The samples were described and <br /> categorized using the Unified Soils Classifintion System and lithologic <br /> descriptions. The results for the exploratory borings are presented in <br /> Appendix A. <br /> Relatively undistu,Lmd soil samples were collected depth f 1 at(borings Bl through B3)and 25 feet (borings through <br /> five-foot intervals thereafter using a California Split Spoon Sampkx <br /> cgnipped with four 2"X6"clean brass sleeves. Borings were advanced to the <br /> desired depth with the hollow stem anger,then the center rod center plug <br /> pilot bit assembly was withdrawn. The sampler, attached to the center rod, <br /> was lowered through the auger to the bottom of the borehole and driven 18" <br /> into the soil with a 140-pound hammer. Prior t. preservation, $ail samples <br /> from each interval were field-checked for the presence of odor,vapor,and <br /> visible staining. Vapor analysis was performed with a hand-Meld <br /> photoionizing detector (PID),which was calibrated daily with a 50 ppm <br /> gasoline vapor standard. At each sample interval the brass sleeve containing <br /> the soil sample with the highest PID reading was immediately preserved and <br /> labeled. <br /> S-Amplcs were preserved by wrapping the sleeve ends with aluminium fail <br /> and capping the ends with plastic caps,,which were secured to the sleeve <br /> with duct tape. 110ch sleeve was labeled with time,date,sample iocatien, <br /> analyses to be mr�,and the project name. The sleeve was placed in a zit) <br /> lock bag and then into an ice chest containing dry ice to freeze the samisle <br /> until hand delivered to a state-certified lab. <br /> The remaining sleeved soil samples were labeled and preserved. Later these <br /> samples were tested for HCl reactions,sieve,dilatancy,moisture, <br /> permeability and plasticity using ASTM D2488-94 field analysis procedures. <br /> San Joaquin County Health officials observed the destruction of the borings <br /> and placement of the neat cement sanitary seals in the monitor wells. <br /> 15. <br />