My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006374
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 4:28:27 PM
Creation date
8/21/2019 2:32:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006374
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
piea c brows""0"'eonstrucuon rax zi"vzoxaa TO neorpc eonrena 11 W-1—rev enyuic•r• rape R via . �•r �• �• �� r+av v,v a.r«. <br /> Integrity Construction <br /> 1386 E. Beamer Street <br /> 'Woodland, California 95776-6003 <br /> State Contractors Lic.# 552686 <br /> Phone, (916) 668-9442 Fax (916) 662-0273 <br /> January 5, 1996 <br /> Westenl Geo-Engineers <br /> .Mr George Converse <br /> 1386 E Beamer St <br /> Woodland, CA 95776 <br /> Re Repoi t oil Pi essui e Te stung and Repairs to Lateials at R-603 <br /> Dear Mi Converse <br /> As your i equested, Integi ity Construction pen forined pressure tests and 1 epairs to the <br /> folloNNing laterals with the followiing results <br /> 1 The 2" PVC line connecting MW 1 to the recoN ery system NN as pi essure tested <br /> at 51b for 15 min The line held pressure and no repairs \N el e requii ed <br /> 2 The V hose connecting MW2 to the recovery systeni %gas pressure tested at i lb <br /> for l5 111111 The hose held pressure and no repairs Avere i equ fired <br /> 3 The 3" PVC lune connecting MW2 to 'MW3 was pressure tested at 51b fol 1.i min <br /> The lune held pressure and no repairs \\ere required <br /> 4 The two, 2" PVC Innes running fi on1 the recovery sy stem over the roof of the <br /> building and into the ti affic box containing the water drop out tank v,ere tested at <br /> 51b for 15 min The lines held pressure and no repairs N\ere required <br /> 5 The mo, 2" PVC lines connecting the \%ater di op out tank and \IW 10 \Nei a <br /> pressure tested at 51b for 15 min The spare 2" PVC lune held pressure and no <br /> i epairs were requn ed The actn e 2" PVC line failed to hold pressure when <br /> tested Several leaks were detected in the piping Asper our discussions, )or1 <br /> directed Integrity Constriction to disconnect the actiN e lune and re-route the <br /> piping as i equired to coiunect the spare 2" pipe to the actin e i ecoi er% s�stein The <br /> connections \\ere made and the lune NNas re-tested at 51b foi 15 min Tine line <br /> held prr�cciirP <br /> The testing and repair s were completed on 12/15/95 <br /> Yours Truly, <br /> Douglas E Brown, Owner <br /> cc John Margowski <br />
The URL can be used to link to this page
Your browser does not support the video tag.