. If evaluations indicate that a continuous groundwater pumping system is needed, selected wells will <br /> be connected to the "ConVault" treatment system <br /> Groundwater recovery lines, from the wells to the treatment compound, will be 318" nylon tubing <br /> inside buried 3" PVC pipe, for double containment considerations <br /> The groundwater recovery Iines will be plumbed to an aboveground polyethylene sediment trap <br /> The contaminated groundwater is pumped from the sediment trap with a centrifugal pump and <br /> sprayed into a "ConVault" 1000-gallon aboveground tank for spray aeration The "ConVault" tank <br /> is a double contained steel tank shrouded in concrete The treatment of the groundwater will occur <br /> in batches (300 gallons per five hours) After treatment the water is then dumped from the <br /> treatment tank, via the centrifugal pump, through a totalizer water meter The water is then passed <br /> through a chamber containing an LEL meter relay calibrated to shut off the system if vapors from <br /> the effluent ever reach the 10% LEL level The clean treated water is discharged to the three-inch <br /> sewer clean out A visual inspection for leaks on aboveground lines, tanks and double contained <br /> system will occur during all site visits <br /> UPDATE STATUS REPORT 439 <br /> Interim groundwater treatment started December 1, 1992 LTT was vacuum lifting (purging) <br /> monitor wells MW1, MW2, MW3, MW8 and MW10 twice a week until May 1993, at that time the <br /> purging was reduced to once a week until discontinued on August 30, 1993 Before the well <br /> purging commenced, water samples were obtained from the "ConVault" tank aerator before <br /> dumping 800 gallons of this treated water to the sewer lateral, see Update Status Report 41 The <br /> ConVault sewer discharges occurred on December 12, 1998 800 gallons of treated purged well <br /> water and condensate was discharged to sewer for a total of 21,422 gallons of treated groundwater <br /> dumped to the sewer as of December 12, 1998 A continuous LEL reading of the discharge water <br /> was observed and noted on the following table All discharge requirements were met <br /> No treated water was dumped to the sewer during the months of March, April, May, June, July, <br /> August, September, October,November, December, 1996, and January, February, April, May, July, <br /> August, September 1997 and March, May, June and October 1998 The last sampling of the <br /> ConVault treated water occurred on December 12, 1998 with results received via Fax on January <br /> 12, 1999 <br /> 2 R-603 W W##39 1/12/1999 <br />