Laserfiche WebLink
TIME FRAME <br /> Janaury-March, 1996 MW8 venting, groundwater gauging <br /> and vapor extraction system air <br /> monitoring. <br /> Awaiting approval of Work Plan to <br /> drill and sample soil borings to <br /> evaluate the effectiveness of the <br /> vapor extraction system <br /> March, 1997 Quarterly Groundwater Sampling <br /> (select wells, MW1, MW2 , MW3 , MW8 , <br /> MW10 and MW12) <br /> HEALTH AND SAFETY <br /> This site is being treated as a class D site, normal common sense <br /> is to be used <br /> LIMITATIONS <br /> The conclusion and recommendations presented in this report are <br /> based upon the following : <br /> A. The exploratory test borings drilled at the site <br /> B . The Bouwer and Rice Slug test <br /> C. The vapor Extraction Source Test <br /> D The observations of field personnel <br /> E The results of laboratory analysis performed by a State <br /> certified laboratory <br /> E Referenced documents <br /> F Specifications supplied by "REMOX° for the Authority to <br /> Construct Permit . <br /> G Our understanding of the regulations of the State of <br /> California, San Joaquin County and City of Stockton. <br /> The services performed by Western Geo-Engineers, a corporation <br /> under California Registered Geologist #3037 and/or Contractors <br /> License #513857, have been conducted in a manner consistent with <br /> the level of care and skill ordinarily exercised by members of <br /> our profession currently practicing under similar conditions in <br /> the State of California and the Stockton area Our work and/or <br /> supervision of remediation and/or abatement operations, active or <br /> preliminary, at this site 3s in no way meant to imply that we <br /> are owners or operators of this site Please note that known <br /> soil and/or groundwater contamination must be reported to the <br /> appropriate agencies in a timely manner No other warranty, <br /> PAGE 4 R603 UPDATE-46 02/04/97 <br />