My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006463
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 4:25:34 PM
Creation date
8/21/2019 2:50:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006463
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.17. REQ FOR DESTROYING MONrMRING WELLS AND EXPLQRATION HOLES <br /> 13.17.1. A monitoring well shall be investigated to determine its condition and details or its <br /> construction prior to its destruction. <br /> 13.17.2. The well shall be sounded immediately before it is destroyed to determine whether <br /> there are obstructions that will interfere with filling and sealing. <br /> 13.17.3 Any obstructions found in the well or boring shall be removed before filling and <br /> sealing operations begin <br /> 13.174 If the well was constructed and maintained in accordance with these Standards, the <br /> sealing material shall be planed under pressure to ensure that the monitoring well is <br /> properly filled and sealed <br /> 13 175 Casing material may require perforation, or puncturing, to allow for proper <br /> placement of sealing materials. <br /> 13 17,5. If the well construction is unknown and/or is located in an area of known or <br /> suspected pollution or contamination, the well shall be destroyed by removing all <br /> m;aterW within the nriguial borehole (including the well casing, screen, filter pack, <br /> and =nular seal); and the created hole filled completely with appropriate sealing <br /> material. <br /> 13 177. Exploratory borimgs, installed for sampling purposes, shall be completely grouted <br /> with appropriate sealing material. The top 3 feet of the boring may be backfilled <br /> with clean, uncontaminated fill material. <br /> 13 178. The well or exploratory boring shall be filled by use of a tremie pipe or equivalent, <br /> proceeding upward from the bottom of the well or boring. Any deviation from this <br /> method must be approved by the Director. k <br /> 13 17.9. Sealing materials shall be placed in one continuous operation unless conditions in the <br /> well or bormg dictate that sealing operations be conducted in a staged manner and <br /> prior approval is obtained from the Director. <br /> 13 17.10. Pressure required for the placement of sealing material shall`be maintained long <br /> enough for sealing materials to properly set. <br /> 13,17.11. Verification shall be made to determine that an adequate seal has beau installed by <br /> a E.hID representative. <br /> 13 17,12. If the well casing was left in place during sealing operations, a hole at least one foot <br /> larger in diameter than the originally drilled hole shall be excavated around the <br /> outside of the well casing to a depth of 3 feet below the ground surface, and the well <br /> • �, shall then be gut off 6 inch.�5 above the bottom of this excavation and <br /> removed. <br /> 13.17.13. The grout used to fill the well shall be allowed to spx`II over unto the excavation, <br /> during the sealing operation, and fill it for a thickness of one foot and form a 'cap" <br /> which has a diameter of at least one foot greater than the diameter of the originally <br /> drilled hole. <br /> 13.17.14 After the sealing operation and the sealing ma nal has set, the excavation shall be <br /> filled with clean soil. <br /> 13.17 15. Any deviation from this section must obtain prior approval from the Director_ <br /> E@ 3�bd a807-:1 EEPE8906OZ VP 61 e00Z/ZT/50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.