Laserfiche WebLink
Claim No 6055 -2- October 8, 2001 <br /> # Task* Amount Pre-A2proved Comments <br /> 3 Site restoration, excavated soil and <br /> fluids removal $2'726 <br /> 4 <br /> Report $1,420 <br /> TOTAL PRE-APPROVED $37,137 <br /> * Task descriptions are the same as those identified in WEGE's September 14,2001 cost estimate <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it <br /> to remain valid Only the tasks/costs reflected on the above table are pre-approved at this <br /> time The Fund will review any tasks/costs that go beyond the pre-approved amount to <br /> determine if the additional tasks and costs are necessary and reasonable <br /> • The work products must be acceptable to the Regional Board <br /> i <br /> + The Fund regulations require three bids for corrective action work unless three bids are <br /> unnecessary, unreasonable or impossible under the particular circumstances Because the <br /> proposed costs appear reasonable, it is unnecessary to obtain three bids for the proposed <br /> corrective action efforts, the Fund's three bid requirement is waived for this scope of work <br /> only Any future scopes of work are subject to the three bid requirement unless a waiver of <br /> the bidding requirements is received <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work <br /> a Although I have referred to the WEGE proposal in my pre-approval above, please be aware <br /> that you will be entering into a private contract the State of California cannot compel you to <br /> sign any specific contract This letter pre-approves the costs as presented in the proposal <br /> dated September 14, 2001 by WEGE <br /> PIease remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed Please insure that your consultant prepares their <br /> invoices to include the required break down of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the SJCEHD <br /> Coliformle En vfronmental Protection Agency <br /> ZJJ Rwyrled Piper <br />