My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006464
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 5:03:23 PM
Creation date
8/21/2019 2:50:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006464
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PROVISIONS <br /> 1 VALIDATIONIkVOCATION—This permrt is not valid unless signed by the Public Works Director or his authorized representative This permit is non- <br /> transferable and is void if work is not completed prior to expiration date An extension may be granted if such is requested forty-eight(48)hours before the <br /> 40permit expires <br /> 2 ACCEPTANCE OF PROVISIONS—It is understood and agreed by the permittee that the performing of any work under the permit shalt constitute an <br /> acceptance of the provisions <br /> 3 KEEP PERMIT AT JOBSITE—The permit and control number shall be kept on the jobsite and shall be shown to any representative of the City requesting <br /> verification of permit issuance <br /> 4 INSPECTION AND APPROVAL—A minimum of 24 hours nonce shall be required prior to placing any backfill connection to any existing facility or the <br /> placement of any concrete or asphalt paving Inspection shall not be deemed a waiver on the part of the City of the right to demand correction of defects <br /> discovered at a subsequent date <br /> 5 STANDARD PLANS AND SPECIFICATIONS--All work shall conform to the City of Stockton Standard Plans and Specifications <br /> 6 SURVEY MONUMENT PRESERVATION—Any monuments including,but not limited to chisel crosses witness corners, and iron pins that control the <br /> location of subdivisions,tracts boundaries,property lines,roads streets or provide survey controls and that may be disturbed or destroyed during <br /> construction,shall be referenced by a licensed land surveyor and reset in the surface of the new construction or set a permanent witness monument <br /> Corner records or Records of Survey shall be filed as required (California Business and Professions Code 8771 and California Streets and Highways <br /> Code 732 5, 1492 5, 1810 5) <br /> 7 MINIMUM INTERFERENCE WITH AND PROTECTION OF TRAFFIC—All work shall be planned and carried out so there will be the least possible <br /> inconvenience to the traveling public Placing of lights barricades warning signs and other safety devices required for public safety shall be the <br /> responsibility of the permittee All work-zone traffic controls shall be in accordance with the most current revision of Chapter 5 of the State of California <br /> Department of Transportation Traffic Manual <br /> 8 STANDARD WORKING HOURS—All work shall be restricted to the hours between 8 30 a m and 4 30 p m, except on arterials and collectors where the <br /> work is timded to the hours between 9 00 a m and 3 00 p m ,unless otherwise noted on this permit <br /> 9 FAILURE TO COMPLY WITH GENERAL PROVISIONS—The permittee agrees to reimburse the City for performing all work and furnishing all materials to <br /> correct any failure to comply with these provisions, as well as all applicable City Ordinances and Standard Plans and Specifications currently in effect <br /> 10 NOTIFICATION OF UTILITY COMPANY—The permittee shalt notrfy utility companies 48 hours prior to beginning any construction which may involve <br /> underground or overhead facilities and will pay all expenses for any removal or relocation necessary Valves on water mains may not be turned off without <br /> permission of the utility company involved <br /> �f1 NOTIFICATION OF POLICE,FIRE AND PUBLIC WORKS DEPARTMENTS—When streets are to be blocked,the Police, Fire and Public Works <br /> Departments are to be notified each day the street is to be blocked and/or when traffic is delayed or hindered Access to fire hydrants shall be maintained <br /> at all times Streets will not be closed without prior approval of City Traffic Engineer and Permit Engineer <br /> 12 CLEANUP OF JOBSITE--The permittee will remove any refuse material from the lobsite within three days after completion of the work <br /> 13 DELINQUENT BILLS—Failure to pay any delinquent bill accrued under any previous permit issued by the Public Works Department will be cause for <br /> rendering the applicant ineligible for any other permit from the Public Works Department until such bill is paid <br /> 14 MEETING EXISTING IMPROVEMENT--The permittee shall be responsible for meeting all adjacent frontage improvements such as paving and sidewalks <br /> 15 PARKING METER AND TRAFFIC SIGN REMOVAL—The permrttee shall contact either the Traffic Maintenance Supervisor at(209)937-7408 or the <br /> Senior Public Works Supervisor at(209)937-8534 of the Public Works Traffic Devices Section at least 48 hours prior to any parking meter or traffic sign <br /> removal <br /> ***IMPORTANT ** <br /> MANDATORY Encroachment Permit Procedures <br /> To provide a more efficient and economical inspection service for Encroachment Permit construction,the following procedure shall be followed by all permittees <br /> 1 Notify the Permit Engineer,(209)937-8366,to obtain a control number,no less than 24 hours, but not in excess of 72 hours prior to the start of work, <br /> and pnor to any required inspections as identified below If work does not begin within 72 hours of the issuance of a control number,the control <br /> number will be invalid and the permittee shall call for anew control number (For City Capital Improvement Projects or subdivision improvements, <br /> permittee shall contact the assigned City Project Engineer at(209)937-8411 for specific instructions prior to the beginning of any work) <br /> 2 Discuss with the Permit Engineer or inspector any unusual or difficult features of the construction <br /> 3 Advise Permit Engineer of name and phone number of contact person for the project prior to beginning work <br /> 4 Notify Permit Engineer one day in advance to cancel a scheduled inspection or to request an additional or earlier inspection <br /> 5 Notify the Permit Engineer upon completion of construction at(209)937$366 <br /> REQUIRED INSPECTIONS <br /> Listed below are several types of construction and points at which inspections must be made,prior to continuing construction operation Unauthorized <br /> continuance of construction beyond and inspection point may result in rejection of all work <br /> CONCRETE PIPE INSTALLATION <br /> 1 Grade and excavate before forming 1 Excavation and bedding <br /> 2 Forming before placement of concrete 2 Pipe installation and/or utility connections <br /> 3 Beginning and during asphalt paving 3 Backfill(compaction test may be required) <br /> 4 Cleanup and final approval 4 Beginning and during asphalt paving <br /> 5 Final approval <br /> _ r <br />
The URL can be used to link to this page
Your browser does not support the video tag.