Laserfiche WebLink
PART F (Cont <br /> F5 Wastewater Strength Estimates - Enter the average annual and rrtmwrmm wastewater strength for this <br /> building for each of the following elements of wastewater strength for the period covered by the Permit <br /> • ANY SIGNIFICANT DEVIATION FROM THESE VALUES CAN RESULT W TERYtNATION OF THE PERMrr. <br /> ELEMENTS OF WASTEWATER STRENGTH UNIT CODE UA)r- DAILY 7_0AY AVG 30 DAY AVC. <br /> Suspended Solids m 1 TSS <br /> Total Chemical Ox en Demand m T COOT <br /> Filtered Chem Oxygen Demand m 1 CODF <br /> Oil and Grease m 1 O&GT !fie NOW None <br /> Chlorine Demand See Instructions m 1 CI21) <br /> Biochemical Oxygen Demand mg11 BOD t Ntm <br /> Total Organic Carbon m /1 TOC <br /> Total Disolved Solids mg/1 TDS <br /> If data from a commercial laboratory was used to determine the values, please give the name and address of the laboratory <br /> Name Address Zip <br /> F6 Pollution Abatement Practices <br /> a Wastewater Pretreatment - Check the type of treatment, if any, given wastewater firm this building sewer before it is <br /> discharged to the community sewer <br /> ❑ none, ❑ holding tank, ❑ grease trap, ❑ oil and water separator, G grsxxfirg, ❑ sedimentation, <br /> 0 pH adjustment, ❑ biological treatment, ❑ chlorination, or ® other <br /> Description <br /> Describe the loading rates, design capacity, physical size, etc of each checked above <br /> Tank Pe at-un. Ntatt is pmyt ed f=st a seda�t bw �#iffi mitio a tank aeca{W <br /> • fcr VM a.= strapping in 300 ga3 on I I J ,c is <br /> puriped tao the seww:- at 5 gprn fcr 1 ho= disdvirged egEry <br /> b Planning Wastewater Pretreatment Improvements - Describe any charges m lreatrnertt or disposal methods planned or <br /> under construction for the wastewater carried by this building sewer <br /> N/A <br /> F7 Stormwater Area <br /> Total Area in square feet exposed to storm water and draining to this building sewer <br /> square feet <br /> rNSFR(rrnoAm — SPF ON RArr <br />