Laserfiche WebLink
WEGE WELL CONSTRUCTION LOG <br /> PROJECT NAME MONITOR WELL NUMBER <br /> TOP OF CASING ELEVATION <br /> PROJECT NUMBER DATE COMPLETED <br /> I WELL TYPE <br /> E REMARKS <br /> i 3 <br /> TYPICAL MONITORING WELL <br /> i <br /> WELL CONSTRUCTION <br /> --- 1P 1 Total Depth of hole <br /> 2 Diameter of boring <br /> 5 8 3 Casing length <br /> 4 <br /> 4 Diameter of casing <br /> 5 Depth to top of screen <br /> tQ S Length of screen <br /> - screen interval <br /> screen type <br /> screen size <br /> 3 <br /> 7 Surface seal <br /> seal material <br /> i s 8 Backfill <br /> seal material <br /> 9 Upper seal <br /> seal material <br /> _ 10 Lower seal <br /> ------ seal material <br /> f <br /> 11 Annulus <br /> f material <br /> i NOTE: Each well constructed with poly-vinyl chloride (PVC) <br /> casing with threaded bottom caps and threaded top caps <br /> Also, PVC steam cleaned before constructing each well <br /> Traffic boxes are water light and locked for security <br />