Laserfiche WebLink
;ARLE OF >1v0N'1vEl ;S <br /> 10) INTRODUCTION I <br /> 2 0) CRITE.RLk FOR NO FURTHER ACTION 1 <br /> ? 0) SITE DESCRIPTION <br />' 4 0) SITE TESTING AND REMEDIATION 2 <br /> 5 0) SOIL CONFIRMATION TESTING 4 <br />' E 0) GROUNDWATER MONITORING <br /> 6 1) Depths to W--tcr <br /> 5 <br />' 7 0) AEROBIC AND ANAEROBIC BIODEGRADATION IFF GROUNDWATER I- <br /> 71) <br /> 571) Aetobtc Biodegradation 15 <br />' 7 2) Anaerobic B.odegradat.o:t 16 <br /> 7 2 1) 13--nitrification 16 <br /> '71 2) Iron (111)Reduction 16 <br />' 7 2 3) Sulfate Reduction 17 <br /> 8 0) VICINITY WATER SUPPLY WELLS 20 <br /> 9 0) VAPOR EXTRACTION SYSTEM AND AIR SPARGING EFFECTIVENESS 20 <br /> 10 0) CLOSURE OF VAPOR EXTRACTION AND AIR SPARGING OPERATIONS 21 <br /> 11 0) RECOMMENDATIONS FOR NO FURTHER REMEDIAL ACTION 21 <br /> FIGURES <br /> Ftglue 1 Site I rx ation Mali <br /> FiVare 2 S.tc Layout Map <br /> 1'will FPII-e Noconu;nttattrnl Mal,01/15/90 <br /> Figure 4 T'111-g t-aconcent-t*gym K-p 12109/92 <br /> Ftullre 5 TPII-g IcocoiiLenitation Mali 05/2R/9R <br /> F.gure u TPH-g Isocouccat atton Map 01/I 1199 <br /> I F'tglue 7 Bemelte 1.ol:4-)ncewratlon Mali 01/15/91) <br /> Figure 8 Benzene lsoconcenwitten M:p 12109 42 <br /> Fltptre 9 R.-nze ne Icoconrenttatloll Mali 05/29/99 <br /> F.bynrc 10 Bcnzcn. IsoconoLtitratlor.Map 0111 1199 <br /> I•tglue I 1 C?tonndwatzl C:tarllent Man 05PR/99 <br /> Figure 12 Fence Dtigram <br /> APPENDICES <br /> ;TDICES <br /> Appendix A St:rroundtng Water W.-IIs <br /> Appendix B Ornnndwaler Monitorrrta Dalt <br /> AppeudLx C IP1I_g Conrertral-on Chart-- <br /> 22 <br />