Laserfiche WebLink
If evaluations indicate that a continuous groundwater pumping system is needed, selected weI <br /> be connected to the "ConVault" treatment system Is will <br /> Groundwater recovery lines, from the wells to the treatment compound, will be 3/8" nylon to <br /> inside buried 3" PVC pipe, for double containment considerations y bjng <br /> The groundwater recovery lines wiII be plumbed to an above ground polyethylene sediment <br /> The contaminated groundwater ns pumped from the sediment trap with a centrafu al um The <br /> sprayed into a "ConVault" 1000 gallon above ground tank for spray aeration The "ConVault" an <br /> is a double contained steel tank shrouded in concrete The treatment of the groundwater will occur <br /> in batches (300 gallons per five hours) After treatment the water is then dumped from the <br /> treatment tank, via the centrifugal pump, through a totalizer water meter The water is then passed <br /> through a chamber containing an LEL meter relay calibrated to shut off the system if vapors from <br /> the effluent ever reach the 10% LEL level The clears treated water is discharged to the three-inc <br /> sewer clean out A visual inspection for leaks on above ground lines, tanks and double <br /> system will occur during all site visits contained <br /> UPDATE STATUS REPORT#31 <br /> Interim groundwater treatment started December 1, 1992 <br /> monitor wells MWI, MW2, MW3, MWS and MWI0 twice a week until May 1993, at tLTT was vacuum hat ttme�the <br /> Purging was reduced to once a week until discontinued on August 30, 1993 Before the well <br /> purging commenced, water samples were obtained from the "ConVault" tank aerator before <br /> dumping 800 gallons of this treated water to the sewer lateral, see Update Status Report #1 The <br /> last dumping was for 1000 gallons, making a total of 16,022 gallons ogf treated roundw <br /> dumped to the server as of April 15, 1998 A continuous LEL reading of the discharge water wer <br /> observed and noted on the following table All discharge requirements were met as <br /> No treated water was dumped to the sewer during the months of March, April, May, June July, <br /> August, September, October, November, December, 1996, and January, February, April, May, Jul <br /> August, September 1997 and March 1998 Sampling of the ConVault treated w <br /> April 14, 1998 with results received April 28, 1998 iter occurred on <br /> Y' Y, <br /> 2 <br /> R-603 WW#3I 4/29/98 <br />