Laserfiche WebLink
R603 UPDATE-14 3/25/93 <br /> temperature readings . Wells MW2, and EX-4 are fitted with a pipe <br /> to hose 2 inch fitting placed between the tee and the 2 inch PVC <br /> flex hose that goes from the well to their individual <br /> condensation dropouts . The condensate dropouts are attached to <br /> the extraction manifold The 3 inch SCH 40 PVC lateral from MW3 <br /> is also fitted with a 2 inch pipe to hose fitting where it enters <br /> the traffic box near MW2 and is teed to the 2 inch tubing from <br /> MW2 at that point . MW1 is fitted with a 2 inch PVC Y to allow <br /> access to the well from the straight leg of the Y and vapor <br /> recovery from the angled leg of the Y The vacuum recovery <br /> piping then rises 7 feet into the air before a 90 degree elbow <br /> connects 2 inch PVC pipe at a slight incline towards the eastern <br /> fence of the compound, 6 feet above the surface From here the <br /> PVC pipe drops into the condensation dropout for MW1, before the <br /> vacuum extraction manifold. MW10 is manifolded to the treatment <br /> compound via SCH 44 PVC pipe underground west towards the store. <br /> Once the pipe reaches the store it connects into a condensation <br /> dropout (Approximately 5 gallon capacity) before heading over the <br /> roof of the store with 2 inch galvanized pipe <br /> The condensation dropout is below ground in a concrete lined <br /> traffic box The condensation collected in this tank is removed <br /> weekly via an air tight valve attached to the top of the air <br /> tight lid of the tank Once the pipe reaches the roof of the <br /> store, it 90 degree elbows Into SCH 40 UV protected PVC pipe and <br /> heads across the roof towards the treatment compound. There it <br /> 90 degree elbows down the wall into a second condensation dropout <br /> tank before the manifold <br /> At the manifold the individual wells' condensation tanks are <br /> connected to their own 2 inch PVC riser (36 Inch in height) with <br /> an orifice plate and a gate valve at the top of the riser. <br /> Vacuum/pressure ports are located on either side of the orifice <br /> plate Each orifice (well) has Its own manometer, calibrated to <br /> read millimeters (mm) of water with red oil These manometers <br /> are connected to the ports for continuous measurement of flow <br /> from a particular well, or in the case of MW2 and MW3 , <br /> combination of wells All the extraction wells are manifolded <br /> together above the gate valve to a 4 inch orifice riser before a <br /> filter in front of the vacuum pump After the vapor stream <br /> leaves the vacuum pump, it is pushed into the thermal oxidizer <br /> which oxidize the gasoline range hydrocarbon vapors at no less <br /> than 1400OF and no greater than 15500F. Influent samples are <br /> obtained from the exit of the pump and effluent samples are <br /> __ ,--,ry `F the ",Armal nxidizer The gasoline <br /> oncainea from ...� <br /> range hydrocarbons are oxidized into heat, CO2 and water vapor, <br /> see UPDATE STATUS REPORT #5 <br /> Tedlar bag samples are obtained from the vapor stream influent <br /> from the individual wells (MW1, MW2-3 , MW10 and EX-411 ) , Influent <br /> into the Remox thermal oxidizer and the effluent The samples <br /> are delivered to WEGE' s portable laboratory and analyzed in <br /> WEGE' s portable laboratory utilizing the Photovac 10s50 PTD-GC <br /> and Shimadzu FID-GC. These samples were analyzed for TFH and <br /> PAGE 5 <br />