My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006542
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006542
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 4:11:40 PM
Creation date
8/21/2019 3:09:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006542
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R603 UPDATE-13 2/15/93 <br /> 1/4 inch pipe to tubing fitting for obtaining vacuum/pressure and <br /> temperature readings . Wells MW2, and EX-4 are fitted with a pipe <br /> to hose 2 inch fitting placed between the tee and the 2 inch PVC <br /> flex hose that goes from the well to their individual <br /> condensation dropouts The condensate dropouts are attached to <br /> the extraction manifold The 3 inch SCH 40 PVC lateral from MW3 <br /> is also fitted with a 2 inch pipe to hose fitting where it enters <br /> the traffic box near MW2 and is teed to the 2 inch tubing from <br /> MW2 at that point . MW1 is fitted with a 2 inch PVC Y to allow <br /> access to the well from the straight leg of the Y and vapor <br /> recovery from the angled leg of the Y The vacuum recovery <br /> piping then rises 7 feet into the air before a 90 degree elbow <br /> connects 2 inch PVC pipe at a slight incline towards the eastern <br /> fence of the compound, 8 feet above the surface . From here the <br /> PVC pipe drops into the condensation dropout for MW1, before the <br /> vacuum extraction manifold. MW10 is manifolded to the treatment <br /> compound via SCH 40 PVC pipe underground west towards the store <br /> Once the pipe reaches the store it connects into a condensation <br /> dropout (Approximately 5 gallon capacity) before heading over the <br /> roof of the store with 2 inch galvanized pipe <br /> The condensation dropout is below ground in a concrete lined <br /> traffic box The condensation collected in this tank is removed <br /> weekly via an air tight valve attached to the top of the air <br /> tight lid of the tank. Once the pipe reaches the roof of the <br /> store, it 90 degree elbows into SCH 40 UV protected PVC pipe and <br /> heads across the roof towards the treatment compound. There it <br /> 90 degree elbows down the wall into a second condensation dropout <br /> tank before the manifold <br /> At the manifold the individual wells' condensation tanks are <br /> connected to their own 2 inch PVC riser (36 inch in height) with <br /> an orifice plate and a gate valve at the top of the riser <br /> Vacuum/pressure ports are located on either side of the orifice <br /> plate . Each orifice (well) has its own manometer, calibrated to <br /> read millimeters (mm) of water with red oil These manometers <br /> are connected to the ports for continuous measurement of flow <br /> from a particular well, or in the case of MW2 and MW3 , <br /> combination of wells All the extraction wells are manifolded <br /> together above the gate valve to a 4 inch orifice riser before a <br /> filter in front of the vacuum pump After the vapor stream <br /> leaves the vacuum pump, it is pushed into the thermal oxidizer <br /> which oxidize the gasoline range hydrocarbon vapors at no less <br /> than 1400OF and no greater than 15500F. Influent samples are <br /> ..1-4-a —e,a �F ,^m t Iia :-wit- of the numn and effluent samples are <br /> VIJLJ.Attu ii.va.. ...... . .__.� �— — <br /> obtained from the stack of the thermal oxidizer. The gasoline <br /> range hydrocarbons are oxidized into heat, CO2 and water vapor, <br /> see UPDATE STATUS REPORT #5 . <br /> A portable ambient air PID-GC (Photovac 10550 packed column) is <br /> used at the site to sample the influent and effluent of the REMOX <br /> oxidizer and the individual wells (MW1, MW2-3 , MW10 and EX--4 " ) , <br /> see Tables 2, and 3 . On November 19 , December 9 and 18, 1992, <br /> "Tedlar" bag samples were obtained of the influent and effluent <br /> PAGE 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.