My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006578
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 3:59:32 PM
Creation date
8/21/2019 3:14:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006578
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VAPOR SAMPLING <br /> COLLECTING LABORATORY SAMPLES <br /> Influent Sample <br /> The influent sample is obtained from a sample port located, after <br /> the system vacuum pump and before the REMOX Unit Sterile poly <br /> tubing is then used to attach a 1 liter tedlar bag, fitted with a <br /> special septum "valve" and tubing bib, to the sample port The <br /> sample port is on the pressure side of the pump and therefore the <br /> bag will fill without need of a pump Once the tedlar bag is <br /> filled, its valve is closed and locked, the appropriate label is <br /> placed on the tedlar bag <br /> Effluent Sample <br /> A sample port for the effluent is located in the exhaust stack of <br /> the Remox system The flow pressure from the exhaust is great <br /> enough to fill a tedlar bag Sterile poly tubing is fitted to <br /> the exhaust port and the tedlar bag Then the sample valve of <br /> the tedlar bag is opened and the bag is filled with the sample <br /> Once the tedlar bag is full , the valve is closed and locked, the <br /> sample port closed, and the appropriate label is placed on the <br /> bag <br /> The labels for both the influent and effluent tedlar bag samples <br /> show the date, time, sample IDn and analyses to be run <br /> Both the influent and effluent tedlar bag samples are then placed <br /> within a cooler, on ice, and are hand delivered to WEGE' s <br /> laboratory that same day <br /> The vapor sample is then infected into an FID (Flame Ionizing <br /> Detector) chromatograph and the resulting chromatogram compared <br /> to standard chromatograms of known TFH (Total Fuel Hydrocarbons, <br /> gasoline) and BTEX (benzene, toluene, ethylbenzene, and xylenes) <br /> concentrations A duel chromatograph comparison is also run <br /> (Photovac 1OS50) to evaluate BTEX, TCE, PCE, and DCE <br /> ON SITE ANALYSIS <br /> Besides bag samples collected for the WEGE laboratory some <br /> samples may be run on site using a Photovac lOS50 PID (Photo <br /> Ionizznd Detector) chromatograph <br /> The influent and effluent samples are collected from the same <br /> ports as the bag samples but 60 cc syringes are used to collect <br /> the sample and 0 5 cc of the vapor sample are then infected <br /> directly into the PID chromatograph The resulting chromatogram <br /> is then compared to a standard run on the same chromatograph <br /> prior to the sample run <br /> page 3 of R603 , 08/1.2/94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.