Laserfiche WebLink
03 001 3 1 <br /> SIT APPROVAL <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 9810 EAST HAZELTON AVENUE, STOCKTON, CA 95205 <br /> TELEPHONE: (209) 468-3120 <br /> BUSINESS HOURS: 8:00 a.m. to 5:00 P.M. <br /> (Monday through Friday) <br /> [ M 6'd 1 1 1 L '14 f , [ r-t'., [ t "r1L' � l i i �P1"•'lY" i r G - :';t; <br /> :4'i •jS�'�'�s� 9 SG`li��t �;}t�,���� 1'lrs� �',[ t�,�•' {''��t r�Y`}},{y��t,.����,yy��S�t, ��• ,�. '`�' a (,yAr,,•:i�, :ty.C,t 7't ,, � <br /> STEP 1 CHECK WITH STAFF- Development Services Staff will explain the requirements and procodures to you. <br /> STEP 2 SUBMIT YOUR APPLICATION- "on you apply, filo all of the following: <br /> • FEE The staff will let you know the current cost of filing an application. Make checks payable to the San <br /> Joaquin County Treasurer. <br /> • FORM Seven(7)copies of the completed application information forms(attached)which all owners must' <br /> sign. <br /> • SiTE PLAN Seven(7)copies of a folded Site Plan(see attached)and two(2)copies of a legible 8-1/2'x 11' <br /> site plan. <br /> • HAZARDOUS One copy of a completed Hazardous Materials Disclosure Survey form(a copy of the form Is <br /> MATERIALS attached). <br /> • DEED One copy of the recorded deed(s)of the property. <br /> • SERVICES If your project requires connect/on to public facilities,you must submit a "will-serve"letter from the <br /> appropriate water,sewer and drainage entities at the time of riling. This letter must Include a <br /> statement from the agency that they will servo the proposed development,and has, or will have, <br /> the capacity to provide such service. <br /> • APPLICATION Staff will check your application. If anything is missing,you will be notified In writing. The applicant <br /> COMPLETE will be sent a postcard once the application has been determined complete. (Your application <br /> cannot be processed until It Is complete.) <br /> STEP 3 APPLICATION PROCESSING <br /> • CEQA The County will decide I/the proposal will have an adverse effect on the environment. If there are <br /> no adverse effects, the application will be processed. If there are potential adverse effects,further <br /> environmental review will be required. Projects that have the potential to adversely affect the <br /> environment will require the preparation of an E.I.R. This may extend the processing time. <br /> • REFERRALS AND Staff will rotor the application to any County departments, other agencies and surrounding property <br /> ACTION owners affected by your proposal. At the and of a review and comment period the staff will <br /> approve your application if they can make required findings. If the staff cannot make the required <br /> findings, the application will be denied. Typically action will betaken on the project within 7-8 <br /> weeks. <br /> • FINAL ACTION The action of the staff can be appealed to the Planning Commission. The stairs action is final <br /> unless appealed. For further Information on the length of the appeal period, contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS The staff will send you the final action and if It is approval it will list conditions, by department, that <br /> must be met before you can start your project. <br /> • IMPROVEMENT in addition to the Site Plan,an Improvement Plan Is frequently required as a condition of approval. <br /> PLANS This Is an engineered plan showing drainage,grading, frontage improvements, accoss, on-and off- <br /> site service and utility facilities,landscaping and circulation/parking details. <br /> • DRIVEWAY Driveway Permits must be acquired from the Public Works Department for any work performed <br /> PERMITS within the road right of way. If the project fronts on a state highway these permits are obtained <br /> from Caltrans. <br /> • SANITATION b Projects that will utilize new on-situ sanitation disposal and/or on-site wells, must get permits from <br /> WELL PERMITS the Environmental Health Division. <br /> • BUSINESS If the project Involves a business, a Business License must be approved prior to starting operation. <br /> LICENSES Business License applications can be processed concurrently with the Site Approval application. <br /> • BUILDING If the project involves construction a building permit must be approved prior to commencement of <br /> PERMITS work. <br /> • OTHER PERMITS Frequently other local,state and/or federal agencies will require permits prior to now uses being <br /> established(e.g.Air Pollution Control District, Regional Water Quality Control Board or the Sheriffs <br /> Office). The Community Development Department will identify additional permits we are aware of <br /> that may be required for your prcjoct. <br /> SMEA►TRAPP RM 4141(IIID) <br />