U �
<br /> Z
<br /> U1
<br /> 6�
<br /> MATERIAL AND WORKMANSHIP - X
<br /> OWNER SUPPLIED EQUIPMENT „Z-� N V 0L
<br /> I. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL ib. GOVERNING CODES AND STANDARD5 INCLUDE, BUT SHALL NOT BE LIMITED B: VENT/VAPOR PIPING: RED THREAD IIA AND RED THREAD it WITH PLEASE REFER TO SEPARATE EQUIPMENT LIST. Z O Q"
<br /> EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK TO, THE STANDARDS OF THE FOLLOWING: FITTINGS AND DS-7000 AND DS-8000 SERIES ADHESIVE, OR AMERON X Z N
<br /> COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE DUALOY 3000/LCX WITH ALCOHOL FITTINGS AND PSX34 ADHESIVE. Z O W r m
<br /> GRADE FOR THE PROCESS INTENDED. UNIFORM FIRE CODE (UFC) DO NOT MIX DIFFERENT MANUFACTURER'S MATERIALS. Z Ip F `�r
<br /> AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) O K1
<br /> 2. THE CONTRACTOR SHALL FURNISH TO THE OWNER'S AGENT FOR HIS AMERICAN PETROLEUM INSTITUTE (APD C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN HJ O � ^'^
<br /> APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER AND AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) TRAINED BY MANUFACTURER Ln
<br /> OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE UNIFORM BUILDING CODE (UBC) <
<br /> PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND NATIONAL ELECTRIC CODE (NEC) D: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE
<br /> MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATES NATIONAL FIRE PROTECTION AGENCY (NFPA) 40, OR EXTRA STRONG. GALVANIZED PIPE IS NOT ALLOWED. FITTINGS
<br /> INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S AGENT. UNDERWRITER'S LABORATORIE5, INC. (UL) SHALL BE 300 PSI MALLEABLE IRON. w
<br /> CALIFORNIA REGULATIONS
<br /> 3. WHEN REQUIRED BY THESE DOCUMENTS OR WHEN CALLED FOR BY THE LOCAL ORDINANCES E: ALL ST2EL PIPE BELOW GRADE 18 TO BE DOUBLE WRAPPED WITH 20
<br /> OWNER'S AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL
<br /> APPROVAL FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES 11. SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN FOR THE TAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP.
<br /> WHICH HE CONTEMPLATES INCORPORATING IN THE WORK. WHEN 60 DURATION OF THE CONTRACT A SITE HEALTH < SAFETY PLAN THAT WILL
<br /> DIRECTED, 5AI-IPLES MAY BE SUBMITTED FOR APPROVAL AT THE EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, F: ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT
<br /> CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. AND: WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL
<br /> COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH
<br /> 4. MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED A: APPOINT AND EMPLOYEE AS THE SAFETY OFFICER WHO 15 QUALIFIED PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 1009' METHANOL, WHICH W - V.
<br /> WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET. W �0
<br /> REJECTION. HEALTH AND SAFETY PLAN. SUBMIT THE NAME AND QUALIFICATIONS OF LLIZ Z LD LD X
<br /> THE SAFETY OFFICER TO THE OWNER'S AGENT PRIOR TO COMMENCING WORK G: G.C. SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL W }
<br /> 5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND ON THE SITE. MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS. W O } LL
<br /> V Q -4 U
<br /> REGULATIONS. W -
<br /> B: THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE II. DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER J F. X n O 01 a) F Q
<br /> 6. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS NUMBERS OF THE SUPERVISORY PERSONNEL, 744E HOSPITAL FACILITIES TANKS SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS REQ'D. BY O. O F- 61 cz W U
<br /> AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE MNFR MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING W = 1Q � W
<br /> OF THE OWNER'S AGENVENGINEER. WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS 15 NOT SHOWN ON SITE PLAN, G.C. SHALL RUN LINES THE MOST DIRECT m W
<br /> OR HAZARDOUS SUBSTANCES BE UNCOVERED. ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. 9. N q 0 w
<br /> 1. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR �.
<br /> LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS G: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP 12. CONSTRUCT NEW FUEL ISLANDS AS SHOWN ON DRAWINGS. U Q=
<br /> PROJECT, IT IS EXPECTED THAT THE MOST RESTRICTIVE CONDITION(S) OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE Q N 67
<br /> WOULD APPLY, NOTIFY THE ARCHITECT OF ALL CONFLICTS. CONDITION. IF THE CORRECTIVE ACTION IS INSUFFICIENT IN THE 13. PROVIDE AND INSTALL CONDUIT ! WIRING FOR PETROLEUM SYSTEM(S)
<br /> OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL AS INDICATED ON THE DRAWINGS.
<br /> CORRECTIVE ACTION CAN BE IMPLEMENTED.
<br /> GENERAL CONDITIONS 14. ALL CONDUIT IS TO BE 3/4", MINIMUM. N
<br /> D: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM E Z
<br /> I. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING CLASS RATING OF 2-A,20-5:C WITHIN 50 FEET OF THE OPERATION. 15. INSTALL MONITORING SYSTEM WITH ANNULAR SPACE PROBES, TURBINE AND W
<br /> COURSE PRIOR TO THE START OF WORW, CERTIFICATION OF THIS MUST BE DISPENSER SUMP PROBES, TANK GAUGES, ALARMS, AND MONITOR CONTROL 0
<br /> PROVIDED TO THE OWNER'S ENGINEER PRIOR TO THE START OF WORK i8. UNDERGROUND SERVICE ALERT (USA.) - THE CONTRACTOR SHALL NOTIFY PANEL IN BUILDING PER DRAWINGS. -1
<br /> MEMBERS OF U.8,4. 2 FULL WORKING DAYS IN ADVANCE OF PERFORMING
<br /> 2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER'S ANY EXCAVATION WORK BY CALLING THE TOLL-FREE ONE-CALL PROGRAM 16. INSTALL NEW DI6PEN8ER5, AND MISC. PETROLEUM SYSTEMS, AS INDICATED
<br /> iu
<br /> TRAINING REQUIREMENTS IN ACCORDANCE WITH CALIFORNIA UST NUMBER (800) 221-26010. ON PLANS AND DESCRIBED IN THE OWNER'S EQUIPMENT LIST.
<br /> REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OWNER
<br /> CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKLIST 11. INSTALL NEW CONCRETE TANK AND DRIVE SLABS AND OTHER CONCRETE AS
<br /> SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO PETROLEUM WORK SCOPE INDICATED ON SITE PLAN, CONCRETE SHALL HAVE A MINIMUM
<br /> OWNER. COMPRESSIVE STRENGTH AT 28 DAYS OF 2500 1-81. CONCRETE SHALL
<br /> 1. PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND OTHERWISE COMPLY W/ CONCRETE DESIGN A6 SPECIFIED IN CIVIL/ARCH DOCS. W lz Q
<br /> 3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK SCHEDULE THAT COORDINATES SCHEDULING WITH OTHER PORTIONS OF G.C. SHALL COORDINATE CONCRETE SLAB WORK W/ PETROLEUM CONTRACTOR WI '4
<br /> MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH THE PROJECT TO THE FULLEST EXTENT POSSIBLE. OR PETROLEUM SUBCONTRACTOR Q 1
<br /> CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO Q N tL
<br /> OWNER. CONTRACTOR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST 2. G.G. SHALL FENCE OFF WORK AREA WITH 6' HIGH CHAIN LINK FENCE. POST "KEEP
<br /> SUPPLIED TANK MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO OUT" SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH WORK DAY TESTING
<br /> OWNER. SECURE FENCING PANELS TOGETHER ul
<br /> I. ALL TESTING SHALL COMPLY WITH MANUFACTURER'S INSTRUCTIONS, TRADEQ ~
<br /> 4. CONTRACTOR TO DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK 3EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW TANKSSTANDARDS AND GOVERNING RULES AND CODES, INCLUDING THE USE OF (K. Q
<br /> W
<br /> . .
<br /> INSTALLATION PRIOR TO THE START OF WORK CERTIFIED AND APPROVED INDEPENDENT THIRD PARTY TESTERS, WHEN
<br /> CONTRACTOR WILL CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH IT'S 4. WHEN 501E IS TO BE STOCKPILED ON SITE FOR SAMPLING: PRIOR t0 OFF-HAUL, REQUIRED.
<br /> EMPLOYEES AND THE MEETING MINUTES WILL BE SUPPLIED TO OWNER CONTRACTOR SHALL PLACE EXCAVATED SOIL ON AND SHALL COVER WITH 4
<br /> MILPLASTIC UNTIL SOIL I6 REMOVEDIN AREA APPROVED BY OWNER / GC2. FULLY TEST ALL SYSTEMS, AND REPAIR AS NECESSARY. SECURE ALL
<br /> 5. CONTRACTOR SHALL HAVE THE . , . .FOLLOWING LICENSES: REQUIREDL.�TS, INSPECTIONS, AND APPROVALS OF THE COMPLETED
<br /> B. GENERAL CONTRACTOR SHALL PROVIDE FOR DISTRIBUTION OF ALL SYSTEM. MAKE ALL REQUIRED ADJUSTMENTS AND CORRECTIONS. ® Z
<br /> A. GENERAL ENGINEERING EXCAVATED SOIL, PER GENERAL PROJECT REQUIREMENTS. O O Ll O
<br /> B. HAZARDOUS MATERIAL SUBSTANCE HANDLING 3. THE PIPING SYSTEM SHALL BE TESTED PER CURRENT MANUFACTURER'S
<br /> INSTRUCTIONS.
<br /> Q N F-
<br /> 6. CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL 6. INSTALL "TYPAR" FILTER FABRIC LINER IN TANK HOLE AND TRENCHES, �' W he w
<br /> HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER WHERE REQUIRED BY WET-HOLE CONDITIONS. PROVIDE TANK HOLD-DOWNS 4. CONTRACTOR SHALL PROVIDE ENHANCED LEAK DETECTION (EL.D.) TEST ON Lu N O '
<br /> AS "ADDITIONAL INSURED" AS REQUIRED BY MANUFACTURER IN WET-HOLE CONDITIONS. SYSTEM AFTER PAVING 15 COMPLETE AND PRIOR TO FINAL PROJECT F = QO to U
<br /> ACCEPTANCE. TEST SHALL BE CONDUCTED BY A CERTIFIED TESTER Q (I) o Z
<br /> A. STATUTORY WORKMAN'S COMPREHENSIVE LIABILITY 1. INSTALL TANKS PER DRAWINGS AND CURRENT MANUFACTURER'S INSTRUCTIONS, CONTRACTOR SHALL PROVIDE WRITTEN REPORT OF E.L.D. TEST TO OWNER'S Q r
<br /> WHICH SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE PRECEDENCE REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF PROJECT. 3 (n lu U QJ c0
<br /> B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS SHALL BE
<br /> LIMIT OF NOT LESS THAN $1000000 PER OCCURRENCE FOR BODILY COMPLETED BY THE CONTRACTOR, AS EACH STEP 15 COMPLETED. 5. PROVIDE A STATIC PRESSURE (LEAK DECAY) TEST, ACCORDING TO THE BAY 3 O O
<br /> INJURY AND PROPERTY DAMAGE. TANK BEDDING AND BACKFILL TO BE PEA GRAVEL. TANK BEDDING IS TO BE AREA AIR QUALITY MANAGEMENT DISTRICT (BAAQMD) MANUAL OF W Z Q
<br /> A MINIMUM Q
<br /> 12". TANK INTEGRITY TESTING SHALL CONFORM TO MNFR'S. RES. PROCEDURES, SOURCE TEST PROCEDURE ST-30 OR CARE PROCEDURE _
<br /> C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED CONTRACTOR SHALL NOTIFY CLINE REPRESENTATIVE 7W0 WORKING DAYS TP-201. nl O
<br /> VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY PRIOR TO TANK ARRIVAL. OWNER'S REP. SHALL WITNESS ALL TANK TESTING `t
<br /> OF NOT LESS THAN $1,000000 PER OCCURRENCE FOR BODILY INJURY AND AT HIS/HER DISCRETION. 6. PROVIDE DOCUMENTATION OF A DYNAMIC BACKPRESSURE TEST OF ALL W
<br /> PROPERTY DAMAGE. VAPOR RETURN LINES ACCORDING TO BAAQMD PROCEDURE ST-21 OR CARE
<br /> 8. PETROL CONTRACTOR TO INSTALL NEW PETROL ELECTRICAL SYSTEMS PER PROCEDURE TP-201, OR AS REQUIRED BY LOCAL REGULATIONS.
<br /> 1. CONTRACTOR TO FLLRNI6H ALL LABOR, MATERIAL, EQUIPMENT, AND PLANS AND MANUFACTURER'S REQUIREMENTS. ARRANGE FOR ALL
<br /> SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE INSPECTIONS. PROVIDE CONDUITSNIIRING, J-BOXES, ETC. REQUIRED FOR 1. PROVIDE LIQUID REMOVAL TEST FOR BALANCE SYSTEMS (GASOLINE) WITH A
<br /> SATISFACTORY COMPLETION OF ALL WORK SHOWN ON, CALLED FOR, OR COMPLETE ELECTRICAL SYSTEMS. LIQUID REMOVAL DEVICE REQUIRED BY A CARE EXECUTIVE ORDER, IF MORE
<br /> REQUIRED BY THE DRAWINGS, EXCEPT AS NOTED BY OTHERS. THAN 100 ML OF LIQUID IS FOUND IN THE VAPOR PATH. THIS SHALL BE
<br /> S. INSTALL EQUIPMENT AS L15TED IN OWNER'S EQUIPMENT LIST AND PROVIDE DETERMINED BY LOWERING THE GASOLINE DISPENSING NOZZLE INTO A
<br /> 8. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM AND INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A CONTAINER AND DRAINING ALL LIQUID, THEN MEASURING THE AMOUNT OF
<br /> BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, COMPLETE PETROLEUM SYSTEM. LIQUID USING A GRADUATED CYLINDER OR BEAKER IF REQUIRED, THE
<br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA LIQUID REMOVAL TEST SHALL BE CONDUCTED AND PASSED ACCORDING TO
<br /> CONSTRUCTION SAFETY ORDERS, C.A.RB. EXECUTIVE ORDERS GUIDANCE LETTERS, 10. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY CARE TEST PROCEDURE TP-201,
<br /> AND ANY OTHER APPLICABLE STATE, CITY, OR COUNTY ORDINANCES. CONTAINMENT LINES PE.R DRAWINGS. CURRENT MANUFACTURER'S �'
<br /> INSTRUCTIONS SHALL BIE FOLLOWED AT ALL TIMES, AND SHALL HAVE 5. PROVIDE STATIC TORQUE TEST OF ROTATABLE PHASE I VAPOR ADAPTERS
<br /> 9. ALL PERMITS TO BE SECURED BY OWNER OR OWNER'S AGENT AND SUPPLIED TO PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS ACCORDING TO CARE PROCEDURE TP-201.
<br /> CONTRACTOR, WHO 18 RESPONSIBLE FOR COMPLYING WITH ALL PERMIT SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP IS COMPLETED.
<br /> CONDITIONS. A: PRODUCT PIPING: PRIMARY PIPING WITH CONTAINMENT SYSTEM S. CART PROCEDUAK RE TP-201-
<br /> 10.
<br /> TEST
<br /> 201 OF OVERFILL PREVENTION DEVICE ACCORDING TO U
<br /> 10. CONTRACTOR SHALL VISIT SITE AND FAMILIARIZE HIMSELF OF RED THREAD IIA AND RED THREAD II WITH FITTINGS AND Q
<br /> ALL EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. 09-1000 AND 05-80270 SERIES ADHESIVE, OR AMERON DUALOY 10. PROVIDE LEAK RATE TEST OF PRESSURE/VACUUM VENT VALVES ACCORDING n
<br /> 3000/LCX WITH ALCOHOL FITTINGS AND PSX34 ADHESIVE. DO NOT MIX 70 CARE PROCEDURE TP-201.
<br /> II. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO DIFFERENT MANUFACTURER'S MATERIALS. ALL PIPING AND CONTAINMENT
<br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR SYSTEMS SHALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT 11. PROVIDE ALL OTHER TESTING AS REQUIRED BY STATE AND LOCAL
<br /> SYSTEM SHALL BE BY THE SAME MANUFACTURER, WITH THE SAME SERIES w z
<br /> REPLACE 70 THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY REGULATIONS, MANUFACTURER REQUIREMENTS, AUTHORITIES TO CONSTRUCT,
<br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S ADHESIVES AND/OR FITTINGS. EXECUTIVE ORDERS AND APPROVAL LETTERS, INCLUDING REQUIREMENTS OF 'a °K
<br /> OPERATIONS. VERIFICATION AND REVERIFICATION TESTING AFTER SYSTEM OPERATION N w o g
<br /> BEGINS. N W N:0uuwu
<br /> 11. ALL EXCAVATIONS SHALL BE PERFORMED IN COMPLIANCE WITH OSHA ANDJ z a � o-w7,w m
<br /> STATE REGULATIONS. tU Q z f S ae}= 0
<br /> pwq
<br /> 400
<br /> O F �[�LLFFa N
<br /> 13. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH
<br /> "AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS BUILTS"
<br /> SHALL BE COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY ON ~ W u ��arcu z
<br /> APPROVED JOB COPY. W Z O i
<br /> x WZm
<br /> 14. CONTRACTOR SHALL PROVIDE A LIST OF SUB-CONTRACTORS, IF ANY, WHO IS)
<br /> WILL BE USED ON THE PROJECT. (30O �i�° d
<br /> §z i <0z
<br /> w z O
<br /> V 3 �=w� �
<br /> 15. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND 6�D A80�
<br /> OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFICATES V'�� �$p7ea�< rT,� N
<br /> REQUIRED t0 RUN THE FACILITY.
<br /> NO.c 9.994
<br /> AAN.9-Otr0'I T,
<br /> PET = 6
<br /> OF 5HEETS
<br />
|