My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
REMOVAL 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 9:50:05 AM
Creation date
8/22/2019 2:30:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2005
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aug-30-04 04:23pm From-Gettler-Ryan Inc +9166311317 T-351 P.003/005 F-255 <br /> Project Location: /✓��/,07�"PC o� .Cod b �ra c� '°"r G"'l <br /> Owner:.>N ce Qit �oo�c7T Phone No: '9/6. 4,Pe-.6l s <br /> Contractor:/92d64r'0 hoc Phone No:S/41�6���',�90 License No: 'b-� 9�9 <br /> INDICA'T'E METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> 2. Submission of verification, e;_, load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12' falls: <br /> X A. Pea gravel--smooth,rounded material not more than one-half(1/2)inch in diameter <br /> _ B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch W cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> _Name t <br /> to t <br /> * <br /> 1 <br /> * Shall be the responsible managing employee on the license or authorized agent. <br /> EH 23 046 (Revised 10/16/03) Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.