My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
REMOVAL 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 9:50:05 AM
Creation date
8/22/2019 2:30:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2005
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAM, dG PROTOCOL FOR ROUTINE TANK REI. ✓ALS <br />The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be representative <br />of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If contamination is documented <br />during closure, an Unauthorized Release Notification must be completed and submitted within five (5) working days pursuant to <br />California Health & Safety Code, Section 25295. <br />WATER NOT PRESENT IN THE TANK PIT <br />TANK <br /># <br />TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION OF SOIL SAMPLES <br />MINIMUM NUMBER <br />of WATER SAMPLES <br />< 1,000 <br />1 per Tank <br />Fill OR Pump End of Tank <br />2 from wall next to tank <br />1,000 - 10,000 <br />2 per Tank <br />1 at each End of Tank <br />3 <br />> 10,000 <br />3 or More <br />per Tank <br />Ends and Middle OR generally <br />spaced along the length of the Tank <br />PIPING AND STOCKPILE <br />PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br />TANK & PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br />WATER IS PRESENT IN TANK PIT <br />TANK <br /># <br />TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION of SOIL <br />SAMPLES <br />MINIMUM NUMBER <br />of WATER SAMPLES <br />< 1,000 <br />< 10,000 <br />Center and Ends OR Sides of Tank <br />2 from wall next to tank <br />1,000 - 10,000 <br />5 per Tank <br />Single Tank <br />3 <br />ends at soil/groundwater <br />I <br />Ends and Middle and generally spaced <br />along the length of the Tank <br />interface & 1 below tank <br />4 from wall next to tank <br />> 10,000 OR <br />ends at soil/groundwater <br />Tank Cluster <br />5 or more <br />interface & 1 below each <br />1 <br />tank <br />SLAB PRESENT IN THE TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br />collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br />TANK <br />TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION of SOIL SAMPLES <br />I# <br />< 1,000 <br />3 per Tank <br />Center and Ends OR Sides of Tank <br />1,000 - 10,000 <br />5 per Tank <br />Center and Ends OR Sides of Tank <br />> 10,000 <br />5 OR More per Tank <br />Ends and Middle and generally spaced <br />along the length of the Tank <br />EH 23 046 (Revised l0/16/03) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.