My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
REMOVAL 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 9:50:05 AM
Creation date
8/22/2019 2:30:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2005
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Each company vehicle is equipped with the following items: <br />- First Aid Kit <br />- Fire Extinguisher <br />- "Stop/Slow" traffic signs <br />- warning Triangle/Flare Kit <br />4.0 TRAINING <br />All personnel who may be exposed to onsite contaminants must <br />provide documentation of the following: <br />- Current certification of 40 hours of (OSHA) classroom <br />instruction/hands-on training to include: <br />- Three days of field experience under the supervision an <br />experienced supervisor. <br />- Eight hours of annual classroom refresher training. <br />- Eight hours of supervisory training if a team member is <br />a designated supervisor. <br />- Hazard communications training. <br />5.0 PROJECT -SPECIFIC TRAINING <br />Project -specific training and information will be provided either <br />before traveling to the site or at the site before entry into the <br />exclusion zone. The information and training will be documented <br />and will include the following: <br />- The contents of this Health and Safety Plan <br />- A discussion of , the health and safety hazards; <br />protective measures and work practices for handling <br />contaminated soil, water or equipment. <br />6.0 LEVELS OF PROTECTION FOR EACH WORK ZONE <br />Protective equipment has been selected for use in each work zone <br />based on anticipated hazards. Specific protective equipment <br />requirements are as follows: <br />Exclusion zone - Level D protection will be required <br />within the exclusion zone for any workers engaged in <br />sample collection or other activities on site. Level D <br />protection will include a hard hat, steel -toed boots, <br />safety glasses, hearing protection, and Nitrile gloves. <br />Coveralls are optional but recommended. <br />Level C protection will be required if PID readings <br />exceeding 100 ppm total volatile organics over <br />F <br />
The URL can be used to link to this page
Your browser does not support the video tag.