Laserfiche WebLink
STATE OF CALIFORNIA <br />STATE WATER RESOURCES CONTROL BOARD <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B�, <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br />MARK ONLY ❑ 1 NEW PERMIT <br />❑ <br />3 RENEWAL PERMIT <br />❑ <br />5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED SI <br />ONE ITEM ❑ 2 INTERIM PERMIT <br />❑ <br />4 AMENDED PERMIT <br />❑ <br />6 TEMPORARY TANK CLOSURE q 8 TANK REMOVED —7 <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />i '' 1 <br />❑ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM <br />❑ 8 100% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />. i MI`4r% ur-ov nir I I MY GUMPLE I _ ALL ITEMS -- SPECIFY IF UNKNOWN <br />l <br />A. OWNER'S TANK I. D. #B. <br />MANUFACTURED BY: l J 1 m1 `C <br />1 <br />C. DATE INSTALLED (MO/DAY/YEAR) ; <br />D. TANK CAPACITY IN GALLONS: S �_O^ ,5 h, <br />II. TANK CONTENTS IFA-11RMARKpnr.r1MRIFTFITGMr <br />1 MOTOR VEHICLE FUEL ❑ 4 OIL <br />A' <br />B. <br />C 1—! to REGULAR ❑ 3 DIESEL <br />L—J UNLEADED ❑ 6 AVIATION GAS <br />❑ 2 PETROLEUM ❑ 80 EMPTY <br />1 PRODUCT <br />❑ 1b PREMIUM ❑ 4 GASAHOL ❑ 7 METHANOL <br />UNLEADED ❑ 5 JET FUEL <br />❑ 3 CHEMICAL PRODUCT F—]95 UNKNOWN <br />❑ 2 WASTE <br />E:]2 LEADED �99 OTHER (DESCRIBE IN ITEM D. BELOW) <br />D. IF (A.1) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C. A. S. s: <br />III. TANK CONSTRUCTION MARK nNF ITEM r1NI Y IN Rr1YGS A R ANn r ANn Al 1 TWAT ADDI ICc IAI DnV n A— C <br />A. TYPE OF <br />❑, 1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 95 UNKNOWN <br />SYSTEM <br />2 SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) <br />❑ 99 OTHER <br />B. TANK <br />1 BARE STEEL <br />F--]2 STAINLESS STEEL <br />F73 FIBERGLASS <br />❑ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM <br />❑ 8 100% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />F—]4 PHENOLIC LINING <br />C. INTERIOR <br />LINING <br />❑ 5 GLASS LINING <br />El6 UNLINED <br />21,95 UNKNOWN <br />❑ 99 OTHER <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES_ NO <br />D. CORROSION <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONE <br />�95 UNKNOWN <br />❑ 99 OTHER <br />E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR)A IL (.' LQ <br />OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) UNKAk W <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND. ROTH IF APPI ICARI F <br />A. SYSTEM TYPE <br />A U 1 SUCTION <br />A U <br />2 PRESSURE A�U:' 3 GRAVITYA <br />U 99 OTHER <br />B. CONSTRUCTION <br />A�U 1 SINGLE WALL <br />A U <br />2 DOUBLE WALL A U 3 LINED TRENCH <br />A U 95 UNKNOWN A U 99 OTHER <br />C. MATERIAL AND <br />CORROSION <br />PROTECTION <br />A U 1 BARE STEEL <br />A U 5 ALUMINUM <br />A U 9 GALVANIZED STEEL <br />A U <br />A U <br />A U <br />2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE (PVC) A U <br />6 CONCRETE A U 7 STEEL W/COATING A U <br />95 UNKNOWN A U <br />10 CATHODIC PROTECTION ALU) <br />4 FIBERGLASS PIPE <br />8 100% METHANOL COMPATIBLE W/FRP <br />99 OTHER <br />D. LEAK DETECTION <br />❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING3 I ERSTI AL <br />MONFORING <br />— <br />0 99 OTHER <br />V. TANK LEAK DETECTION <br />❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br />❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE E: J5 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION <br />1. ESTIMATED DATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH <br />SUB STANCE REMAINING GALLONS NERTMATERIAL? YES NO <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE, SES1.OF MY` N qC DGE, IS TRUE AND CORRECT <br />APPLICANTS NAME a �" DATE <br />(PRINTED 8 SIGNATURE) Vim c . U. <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # FACILITY # TANK # <br />STATE I.D.# q 12 Is 1 J_tEUD�----- <br />'ERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br />THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION • FORM A. UNLESS A CURRENT FORM A HAS 13FFN FILED. <br />FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br />FORM B (12-91) <br />FOR0034B-R6 <br />tux. <br />