Laserfiche WebLink
VIED PROG-kM CONSOLIDATED FOI1p <br /> 3 <br /> TANKS 9/if/a <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br /> VI.PIPING CONSTRUCTION(Check all that apply) it <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE 19 1.PRESSURE ❑2.SUCTION ❑3.GRAVITY 458. Cl 1.PRESSURE ❑2.SUCTION Cl 3.GRAVITY 459. <br /> CONSTRUCTION/ ❑1.SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER 460. ❑1.SINGLE WALL ❑95.UNKNOWN 462. <br /> MANUFACTURER <br /> ®2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER 461• MANUFACTURER 463. <br /> ❑ 1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL ❑ 1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL <br /> ❑3.PLASTIC COMPATIBLE WITH CONTENTS ❑95.UNKNOWN ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑8.FLEXIBLE(HDPE) ❑99.OTHER <br /> ❑4.FIBERGLASS ❑8.FLEXIBLE(HDPE) ❑99.OTHER ❑4.FIBERGLASS ❑9.CATHODIC PROTECTION <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 464. ❑5.STEEL W/COATING ❑95.UNKNOWN 465. <br /> VII.PIPING LEAK DETECTION(Check all that apply)(A description of the monitoring program shall be submitted to the local agency.) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466. SINGLE WALL PIPING 467. <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> [31. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP [31. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION <br /> +AUDIBLE AND VISUAL ALARMS. +AUDIBLE AND VISUAL ALARMS. <br /> ❑2. MONTHLY 0.2 GPH TEST [32. MONTHLY 0.2 GPH TEST <br /> ❑3. ANNUAL INTEGRITY TEST(O.1 GPH) ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> [34. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING [35. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(O.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): [36. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> ❑7. SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW ❑7. SELF MONITORING <br /> E19. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> ❑8. DAILY VISUAL MONITORING <br /> [19. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> ❑c. NO AUTO PUMP SHUT OFF ❑c. NO AUTO PUMP SHUT OFF <br /> ❑11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT ❑11. AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> [313. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> [315. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW ❑15.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> ❑ 16. ANNUAL INTEGRITY TEST(0.1 GPH) [116. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> C]17. DAILY VISUAL CHECK ❑ 17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 468. []1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4. DAILY VISUAL CHECK 469. <br /> DATE INSTALLED [12. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5. TRENCH/LINER MONITORING <br /> [13. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR ❑6. NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> SIGNAT RE ERl9PI R eW 470. <br /> DATE: <br /> NAME OF OWNER/OPERATOR(print): Tom PiSICOr(Agent for Shell) TITLE OF O EWOPERATOR: Project Manager(Agent for Shell) 472. <br /> Permit Number(Agency use only) 473. 1 Permit Approved By(Agency use only) 4'4 Permit Expiration Date(Agency use only) 475, <br /> UPCF hwfwrc-b(1/99)-3/4 http://www.unidocs.org Rev.02/16/00 <br />