Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 2 <br />�MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) Mso <br />t,pt t. CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT (UbC) <br />PANEL MANUFACTURER: Ve tO e4L - FZ O 0 7 M`I MODEL 4. 8 Z yQ m Z 2- Msz <br />LEAK SENSOR MANUFACTURER V E E.be z - 0 ( M51 MODEL q(S): S 4(3 F 0 Z 9' Msa. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? e. YES ❑ b. NO M55 <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? a. YES ❑ b. NO Ms6. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a. YES ❑ b. NO M57. <br />❑ 2. MECHANICAL ASSEMBLY (c g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE )N CASE OF LEAK <br />ASSEMBLY MANUFACTURER: M58 MODEL s(S): M59 <br />❑ 3.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Raµmrcisg wy wpaovy) M68. <br />❑ 4. NO DISPENSERS <br />❑ 99. OTHER (Specify) M6i. <br />❑ I. WE HAVE BEEN NOTIFIED BY THE, STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70 <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644, 1, ELD 19 PERFORMED EVERY 36 MONTHS AS REQUIRED <br />REFYtENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) Mab. <br />I. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of 1/01/2005) <br />4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. Q CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "IIANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCH PUBLICATION: "WEEKLY MANUAI. TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. ❑ OTHER (Specify): Mti. <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and Can access those documents when needed. <br />By January 1, 2005 this facility will have a "Designated UST Operator' who has passed the operator exam administered by the International Code Council (TCC) By <br />January I, 2005, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems, <br />This training will include, but is not limited to, the following; <br />➢ Operation ofthe UST systems in a mannerconsistenl with the facility's best management practices <br />> The facility employee's role with regard to the leak detection equipment. <br />> The facility employee's role with regard to spills and overfills. <br />> Whom to contact for emergencies and leak detection alarms. <br />For faoitiry employees hired on of after January 1, 2005, the initial training will be conducted within 30 days of the date of hire. <br />Please Use this section to include any additional UST system monitoring -related information (e g., additional information required by your local agency): Mss. <br />AS OF 1/1/05, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SEC'f10N 111 OF THE CURRENT UST OPETtATING PERMIT APPLICATION - <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />UST SYSTEMS IN ACCORDANCE WITH 23 CCR ' 2715(b). <br />CERTIFICATION. I certify that the information provided herein is true and accurate to the best of my knowledge, <br />OWNER/OPERATOR SIGNATURE 1PLEPRESENTINDATA m,51 <br />lj/� Owner moo. <br />(. Operate <br />OWN PERATOR NAME (print): % / M` OWNER/OPERATOR TITLE: M9a. <br />/L'i � / I r- b /1 <br />(Agdncy Use Only) This plan has been reviewed turd: ❑ Approved ❑ Approved With Conditions ❑ Disapproved <br />Local Agency Signature: Date; <br />Comments/Special Conditions: <br />SJCEHDA ([71/031,. 1m <br />07/23/03 <br />E0 39dd _1_13HS001d31VM bSZLEEEGOZ bS:EO S00Z/GZ/b0 <br />