Laserfiche WebLink
r-1 <br />Ak <br />SAN JOAQWN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />UNDERGROUND STORAGE TANK <br />RESPONSE PLAN — PAGE 1 (One form per facility) <br />TYPE OF ACTION ❑ 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION Rol. <br />FACILITY ID III (Agency Use Only) <br />FA4;ILITY NAME �.04r R02 <br />ej <br />FACILITY SITE ADDRESS R03CITY R0I <br />4;(ifAj (fA <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan. <br />➢ If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material from the UST system. <br />Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. >n <br />➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br />to be effective. It will then be managed properly. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. <br />Facility personnel will determine whether or not any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br />contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. <br />will not be disposed to storm water systems. <br />➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br />1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br />2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous' material collected in secondary containment; <br />3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination is not.compatible with secondary containment. <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if applicable) <br />EQUIPMENT LOCATION AVAILABILITY <br />RIO. R20. R30. <br />RI I. R21. R31. <br />R12 R22. R32. <br />R13 R23. R33. <br />R14 R24 R34. <br />R15 R25. R35. <br />THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANl' WORK NECESSARY UNDER THIS RESPONSE PLAN: <br />NAME - / / R40 <br />TITLE R50. <br />i <br />NAME R41 <br />TITLE R51. <br />NAME R42. <br />TITLE Rsz. <br />NAME R43. <br />TITLE R53. <br />This information is required only when the presence of the hazardous substance can not be determined directly by the monitoring method used (e.g., where liquid level <br />measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br />THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br />CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br />R60. <br />SJCEHD-e (06/03) - 1/3 06/25/03 <br />